Attachment 13- Amended Flood Study MCU12/0208
Very large file (37.1 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
Original PDF page 27, section 1. The text section number identifies this passage in the reader.
Noosa on Weyba Flood Study 8 Developed Case Results 8.1 Peak Water Levels The developed case peak water levels are shown in Appendix F. The resultant impact on peak water levels for the local and regional flood events are also shown in Figures 22 to 35. The resultant minimum lot levels are shown in Figure 13B. J&K Hofmann Site The 100 year ARI peak flood level (with climate change) around Precinct 3 Area H is approximately 3.01 mAHD. Therefore the minimum floor levels in this area are 3.51 mAHD. The 100 year ARI peak flood level (with climate change) around the northern section of Precinct 3 Area I is approximately 3.48 mAHD. Therefore the minimum floor levels in this area are 3.98 mAHD. The remainder of Precinct I is well above the flood level of the tributary, even with the easement crossing in place. The 100 year ARI peak flood level (with climate change) around Precinct 4 Area K is approximately 7.16 mAHD. Therefore the minimum floor levels in this area are 7.66 mAHD. For the proposed lot adjacent to Hollett Road the 100 year ARI flood level (with climate change) is 7.53 mAHD, and so the minimum floor level is 8.03 mAHD. The 100 year ARI peak flood level (with climate change) around Precinct 4 Area L is a maximum of 5.40 mAHD. Therefore the minimum floor levels in this area are 5.90 mAHD Precinct 4 Area J is located well above the flood level of the tributaries. The 100 year ARI peak water level over the proposed internal road, running parallel Hollett Road is variable but is approximately 7.39 mAHD at the crest, with a maximum depth of 40mm. The PMF peak depth is approximately 220mm, which is considered trafficable. The dV product across the road in a PMF event is approximately 0.33 m 2/s. The peak water levels immediately upstream of this crossing, i.e. within the Hollett Road reserve, have been increased in major flood events. However, the increase is generally contained within the road reserve and does not extend a significant distance upstream. As an alternate route with improved flood immunity is proposed this is considered acceptable. This approach also allows the existing vegetation within the road reserve to be maintained. The 100 year ARI peak water level across the proposed easement crossing is 4.36m AHD, resulting in a flood depth of 60mm, and so it is trafficable in a 100 year ARI event. It also has 10 year ARI immunity. This crossing does not have PMF trafficability. This crossing could potentially improve flood access for the neighbouring Lake Entrance Boulevard area. The peak water levels upstream of the easement crossing are increased. This increase is contained within the site. The water levels downstream of the easement are decreased by approximately 6mm in the 100 year ARI event and 10mm in the 20 year ARI event. This decrease extends up to Lake Entrance Boulevard. In the 2 and 1 year ARI events, there are some small areas of increase of approximately 6mm downstream of the easement, near the confluence with Eenie Creek. These increases are contained within the waterway area. It should be noted that additional attenuation provided by the proposed rainwater tanks and bio-retention basins is likely to reduce this impact. The filling of the three lots within Precinct 3 Area I has not had a noticeable impact on peak flood levels in this area. Northbrook Site The 100 year ARI peak flood level (with climate change) around Precinct 2 is approximately 2.80 mAHD. Therefore the minimum floor levels in this area are 3.30 mAHD. The 100 year ARI peak flood level (with climate change) within Lake Weyba is 2.72 mAHD. Therefore the minimum floor level for lots adjacent to the lake (Precinct 1) is 3.22 mAHD. Northbrook Corporation Pty Ltd Version 4 16 September 2013 Flood Study v4.doc Commercial in Confidence Page 22
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment 13- Amended Flood Study MCU12/0208Related documentApplication case desk ↗
About this file
- File size
- 37.1 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.