Noosa on Weyba Flood Study The Hollett Road East tributary crossing has a variable flood level upstream. The maximum depth of flooding in the 100 year ARI event is approximately 80mm across the road. In the PMF event the maximum flood depth is approximately 270mm, and the dV product across the road is 0.30m 2/s. The peak flood levels upstream of this crossing are increased, however this area is a designated nature refuge, and the increases do not extend a significant distance. The southern crossing of Keyser Creek has 100 year ARI flood immunity (with climate change). The PMF flood level is controlled by the regional PMF event (4.23 mAHD), and so the peak depth of flooding is approximately 400mm in this event. The Tidswell Road upgrade has 5 year ARI flood immunity, and it is trafficable in a 100 year ARI event (not including climate change). During a PMF event, it has a depth of flow of approximately 730mm across it, and is therefore not trafficable. From the developed case results, it is clear that the impact of filling required for lots and road crossings is that the peak water levels are increased within the site for major flood events and immediately upstream of upgraded road crossings. Due to the steep rise in surface levels upstream of Lot 11 and the low velocities in the area, the increase in peak water levels within Lot 11 does not impact on upstream properties. The impact at comparison point H2 in the 100 year ARI event is 9mm, which is considered negligible. In major flood events there are some localised increases in the depressions along the site boundary which are greater than 10mm. These areas are low-lying densely vegetated areas, and so minor water level increases would not impact on the function of these areas. Given the rural zoning of the lot in which these localised increases occur, and the fact that the area could not be developed for any alternate use, it is considered that there is no actionable nuisance. In minor events, there are some decreases in peak flood levels within the site and downstream. This is mainly due to the invert levels of the proposed culverts being lower than the existing tracks, which improves flow conveyance during minor events, and allows local peaks to exit the site before the peak flow from the remainder of the upstream catchment arrives. The developed case peak water levels within the 1D section of the model, i.e. Lake Weyba and Weyba Creek, are not different from the existing case levels. 8.2 Peak Flows The developed case peak flows are shown in Appendix G. J&K Hofmann Site The easement crossing effectively reduces the peak flows being discharged into Eenie Creek for all ARI events except. It should be noted that minor flow attenuation provided by the proposed rainwater tanks and bio-retention basins is expected to further reduce this peak flow in minor events. There are some points within Eenie Creek, upstream of where the site would discharge, where the flows have been shown to be increased by approximately 0.5 percent. This is not considered to be a result of the development, but rather a small model instability. It should be noted that detention basins will be required for Precinct 4 Area L and the northern part of Precinct 3. Northbrook Site Downstream of Lot 11 the peak flows are less than the existing case for all ARI events. This is due to the attenuation provided by the culvert crossings of Keyser Creek and its tributary. At the confluence of Eenie and Keyser Creek, the peak flows are less than the existing case for all ARI events. 8.3 Peak Velocities The developed case peak velocities are shown in Appendix H. J&K Hofmann Site The peak velocities within the tributary have been reduced by approximately 0.1 m/s due to the blockage of flow provided by the easement crossing. Northbrook Corporation Pty Ltd Version 4 16 September 2013 Flood Study v4.doc Commercial in Confidence Page 23
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment 13- Amended Flood Study MCU12/0208Related documentApplication case desk ↗
About this file
- File size
- 37.1 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.