Noosa on Weyba
Flood Study
Northbrook Site
The comparison points are located near the culvert inlets, which show localised increases in peak velocities
of approximately 0.5 m/s. Scour protection will be provided in these areas. In general, due to the restriction
of the flood area, the peak velocities are increased by approximately 0.1 m/s. The peak velocities in the
western drainage channel are still quite low, at approximately 0.3 m/s.
8.4 Sensitivity Analysis
8.4.1 Waterway Corridor Revegetation
A scenario was run where the proposed waterway corridor was densely revegetated, with a typical
Manning’s n roughness of 0.15, to determine the potential impact on the 100 year ARI peak water levels.
This will determine whether revegetation would be feasible in this area.
Figure 36 shows the impact of revegetating the western drainage channel. The results are shown for the
100 year ARI events (local and regional) compared to the developed case without revegetation. The results
show an increase in water level of up to 110mm at the southern boundary of the site. The lot levels have
been set 500mm above the 100 year ARI peak flood level with climate change. Therefore there is
considered to be more than sufficient freeboard to account for this impact of revegetation.
Upstream of the Lot 11, there is a small area of increase in peak water level extending for a distance of
approximately 20 metres further upstream. The increase is approximately 20mm. However as this area is a
densely vegetated drainage channel, and no existing properties are impacted, this localised increase is
considered to be acceptable. Dense revegetation of the western drainage channel is therefore considered to
be achievable with acceptable flood impacts for the site and surrounding properties.
8.4.2 Culvert Blockage
A scenario was also run with 20 percent blockage of the proposed culverts. This will determine whether
additional freeboard would be required. The results of this analysis are shown in Figure 38.
The results are shown for the 100 year ARI events (local and regional) compared to the developed case
without blockage. The base case assumed no blockage as the culvert crossings are also being utilised for
attenuation of peak flows, and reducing the flow capacity would have reduced peak flows downstream.
The average impact of 20 percent culvert blockage was:
Hollett Road West (Internal Road): 50mm increase in upstream peak water level;
Easement crossing: 30mm increase in upstream peak water level;
Hollett Road East tributary crossing: 60mm increase in upstream peak water level;
Southern Keyser Creek crossing (Lot 11 Access Road): 20mm increase in upstream peak water level;
and
Tidswell Road: 20mm increase in upstream peak water level.
The freeboard provided is considered to be sufficient to account for these increases. The peak depths over
the road will be slightly increased, however it is considered that this will not impact on the level of trafficability
as current peak depths in the PMF and 100 year ARI events are less than the limiting values.
8.4.3 Severe Culvert Blockage
Item 86 of the SCRC RFI raised concerns with the potential for severe blockage of the culverts on Keyser
Creek, and the resultant impacts on properties located upstream of these culvert crossings. An analysis was
therefore run where 100 percent blockage of all culverts was assumed. The results are shown in Figure 39.
The results are shown for the 100 year ARI events (local and regional) compared to the developed case
without blockage. The base case assumed no blockage as the culvert crossings are also being utilised for
attenuation of peak flows, and reducing the flow capacity would have reduced peak flows downstream.
The average impact of 100 percent culvert blockage was:
Hollett Road West (Internal Road): 170mm increase in upstream peak water level;
Northbrook Corporation Pty Ltd Version 4 16 September 2013
Flood Study v4 2.doc Commercial in Confidence Page 24
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment 13- Amended Flood Study MCU12/0208Related documentApplication case desk ↗
About this file
- File size
- 37.1 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.