Easement crossing: 120mm increase in upstream peak water level;
Hollett Road East tributary crossing: 330mm increase in upstream peak water level;
Southern Keyser Creek crossing (Lot 11 Access Road): 1840mm increase in upstream peak water
level; and
Tidswell Road: 120mm increase in upstream peak water level.
Since the original application was prepared, the location of the access road to the site has been relocated to
the southern boundary. It has been offset from this boundary to minimise flood impacts to the neighbouring
properties. This road crossing is now located upstream of Areas F and G, and so blockage of culverts would
have minimal impact to these proposed lots.
The results of the analysis showed that even with complete blockage of all proposed culverts that sufficient
flood immunity is provided for all of the proposed lots. However, the increase upstream of the Keyser Creek
crossing is significant, as the minimum road level (3.83 mAHD) had to be set high enough to maintain
trafficability during a regional PMF event. This could potentially exacerbate existing flooding issues for some
upstream properties.
A range of blockage factors was trialled, to look at the potential impact at comparison points H0, H1, H2 and
H3 which are located upstream of the site in Keyser Creek. The results are shown in the table below.
Table 8-1 Sensitivity Analysis – Culvert Blockage
Comparison 100 Year ARI Local Peak Water Level
Point (mAHD)
Blockage Factor
0% 20% 50% 80% 100%
H0 3.72 3.72 3.72 3.72 4.09
H1 3.07 3.07 3.07 3.16 4.09
H2 2.62 2.62 2.62 3.11 4.09
H3 2.25 2.26 2.35 3.10 4.09
The results show that there is minimal impact upstream, even with 50 percent blockage of the culverts. If the
blockage factor is increased to 80 percent then there is a significant impact directly upstream of the culverts,
however, the impact is significantly reduced before it affects areas where there are existing properties (H0
and H1). It is only when there is 100 percent blockage of the culverts that upstream properties are
negatively impacted upon.
It is considered that this situation is extremely unlikely given the large size of the proposed culverts (flow
2
area totalling 32.4 m ) and the low flow velocities in the area. However, in order to reduce the likelihood of
blockage it is proposed to install debris deflector walls on the culvert inlets for the southern crossing of
Keyser Creek. An example of debris deflector walls is shown in Figure 10.07 of QUDM (2007). The purpose
of the debris deflector walls is to allow built up debris to rise with the flood waters, allowing flows to pass
underneath.
Project 11 of AR&R: Blockage of Hydraulic Structures (2013) details the levels of blockage that should be
considered for culvert crossings. Table 3.16 summarises the proposed blockage values that should be used
for various types of culverts. For culverts with effective debris control measures, such as debris deflector
walls, the design blockage is 10 percent and the severe blockage amount is 25 percent. Given that even
with 80 percent blockage there is minimal impact to upstream properties, the provision of debris deflector
walls is considered to sufficiently reduce any increased flood risk to upstream properties resulting from the
proposed development.
Northbrook Corporation Pty Ltd Version 4 16 September 2013
Flood Study v4.doc Commercial in Confidence Page 25
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment 13- Amended Flood Study MCU12/0208Related documentApplication case desk ↗
About this file
- File size
- 37.1 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.