Skip to the record
Every meeting, every word.

Council archive · source document

Attachment 13- Amended Flood Study MCU12/0208

of 130

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (37.1 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.

Original PDF page 31, section 1. The text section number identifies this passage in the reader.

Noosa on Weyba
Flood Study




8.5                    Proposed Emergency Evacuation Routes
Figures 39 and 40 show the PMF peak flood levels and depths. There are high points within each section of
the development where people could safely congregate in a PMF event. Areas E and L, which are proposed
retirement villages and aged care facilities, are located well above the PMF flood level.
Access for emergency vehicles may be required in a PMF event. The emergency evacuation routes are
shown in Figure 14. All areas of the site can be accessed during a PMF event.
Flood access for neighbouring areas will also be improved, as described below.
      The existing property to the south of Lot 11 is inaccessible during a 5 year ARI event. This lot would
       now have access during a PMF event.
      The existing properties located around Precinct 4 would also have access along the internal access
       road adjacent to Hollett Road West, which has 10 year ARI flood immunity and is trafficable during a
       PMF event.
      The Lake Entrance Boulevard area is inaccessible during a 2 year ARI event. The proposed easement
       is trafficable during a 100 year ARI event (with climate change).




Northbrook Corporation Pty Ltd                     Version 4                                 16 September 2013
Flood Study v4 2.doc                         Commercial in Confidence                                 Page 26

Used in these records

About this file

File size
37.1 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Attachment 13- Amended Flood Study MCU12_0208.pdf · 37.1 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.