Council archive · source document
Attachment 13- Amended Flood Study MCU12/0208
Very large file (37.1 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
Original PDF page 31, section 1. The text section number identifies this passage in the reader.
Noosa on Weyba
Flood Study
8.5 Proposed Emergency Evacuation Routes
Figures 39 and 40 show the PMF peak flood levels and depths. There are high points within each section of
the development where people could safely congregate in a PMF event. Areas E and L, which are proposed
retirement villages and aged care facilities, are located well above the PMF flood level.
Access for emergency vehicles may be required in a PMF event. The emergency evacuation routes are
shown in Figure 14. All areas of the site can be accessed during a PMF event.
Flood access for neighbouring areas will also be improved, as described below.
The existing property to the south of Lot 11 is inaccessible during a 5 year ARI event. This lot would
now have access during a PMF event.
The existing properties located around Precinct 4 would also have access along the internal access
road adjacent to Hollett Road West, which has 10 year ARI flood immunity and is trafficable during a
PMF event.
The Lake Entrance Boulevard area is inaccessible during a 2 year ARI event. The proposed easement
is trafficable during a 100 year ARI event (with climate change).
Northbrook Corporation Pty Ltd Version 4 16 September 2013
Flood Study v4 2.doc Commercial in Confidence Page 26
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment 13- Amended Flood Study MCU12/0208Related documentApplication case desk ↗
About this file
- File size
- 37.1 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.