Attachment 13- Amended Flood Study MCU12/0208

of 130

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (37.1 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.

Original PDF page 32, section 1. The text section number identifies this passage in the reader.

Noosa on Weyba
Flood Study




9                      Flood Storage
9.1                    Reduction in Flood Storage
The flood storage within Lot 11 on RP893393 for the existing and developed cases is shown below in Table
9-1. Due to filling required for lots and road crossings, the amount of storage on site has been reduced. At
2.25 mAHD, which is approximately the existing case 100 year ARI peak water level, the flood storage on
                                            3
site has been reduced by around 25,600m .
Local and regional flood modelling has shown that in major events under developed conditions, the peak
water level within the site is increased, but the impact on neighbouring areas is negligible. This is because
at the southern boundary of the site there is a sharp increase in surface levels, and so increases in flood
levels within the site do not extend upstream. The waterway corridor width at the southern boundary of the
site has also been widened to 190 metres, which is equal to the existing 100 year ARI flood width at this
point, so that local overland flow paths are not impeded.
Downstream of the site, the loss of flood storage within the site does not impact on flood levels for
neighbouring areas. Lake Weyba covers an area of 997 hectares. The volume of flood storage available
between 2.09 mAHD (which is the current SCRC 100 year ARI regional flood level in Lake Weyba) and 0.36
                                                                                 3
mAHD (which is the MHWS level at Munna Point) is approximately 17,250,000m . There is also significant
additional flood storage in the surrounding flood-plain areas. Therefore the loss of flood storage within the
site is minor when compared to the surrounding flood-plain and Lake Weyba.
Table 9-1              Flood Storage within Lot 11

         Level                                 Storage (m³)
        (mAHD)                  Existing      Developed Case          Difference
                                 Case
           3.00                  175,024         106,454                -68,571
           2.75                  138,102             86,054             -52,048
           2.50                  105,537             67,913             -37,624
           2.25                  77,041              51,425             -25,616
           2.00                  52,515              36,422             -16,093
           1.75                  31,558              22,985              -8,573
           1.50                  14,689              11,563              -3,127
           1.25                   4,406              3,695                -711
           1.00                   422                 342                 -80
           0.75                    4                   1                   -3
           0.50                    0                   0                   0


Compensatory excavation within the site has not been proposed due to the potential environmental impacts.
It was considered beneficial to preserve the existing waterway and vegetation through Lot 11 in its current
state. Flood modelling has shown that compensatory excavation is not required for flood alleviation
purposes.




Northbrook Corporation Pty Ltd                             Version 4                         16 September 2013
Flood Study v4 2.doc                                 Commercial in Confidence                         Page 27

Used in these records

About this file

File size
37.1 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Attachment 13- Amended Flood Study MCU12_0208.pdf · 37.1 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.