Noosa on Weyba
Flood Study
9 Flood Storage
9.1 Reduction in Flood Storage
The flood storage within Lot 11 on RP893393 for the existing and developed cases is shown below in Table
9-1. Due to filling required for lots and road crossings, the amount of storage on site has been reduced. At
2.25 mAHD, which is approximately the existing case 100 year ARI peak water level, the flood storage on
3
site has been reduced by around 25,600m .
Local and regional flood modelling has shown that in major events under developed conditions, the peak
water level within the site is increased, but the impact on neighbouring areas is negligible. This is because
at the southern boundary of the site there is a sharp increase in surface levels, and so increases in flood
levels within the site do not extend upstream. The waterway corridor width at the southern boundary of the
site has also been widened to 190 metres, which is equal to the existing 100 year ARI flood width at this
point, so that local overland flow paths are not impeded.
Downstream of the site, the loss of flood storage within the site does not impact on flood levels for
neighbouring areas. Lake Weyba covers an area of 997 hectares. The volume of flood storage available
between 2.09 mAHD (which is the current SCRC 100 year ARI regional flood level in Lake Weyba) and 0.36
3
mAHD (which is the MHWS level at Munna Point) is approximately 17,250,000m . There is also significant
additional flood storage in the surrounding flood-plain areas. Therefore the loss of flood storage within the
site is minor when compared to the surrounding flood-plain and Lake Weyba.
Table 9-1 Flood Storage within Lot 11
Level Storage (m³)
(mAHD) Existing Developed Case Difference
Case
3.00 175,024 106,454 -68,571
2.75 138,102 86,054 -52,048
2.50 105,537 67,913 -37,624
2.25 77,041 51,425 -25,616
2.00 52,515 36,422 -16,093
1.75 31,558 22,985 -8,573
1.50 14,689 11,563 -3,127
1.25 4,406 3,695 -711
1.00 422 342 -80
0.75 4 1 -3
0.50 0 0 0
Compensatory excavation within the site has not been proposed due to the potential environmental impacts.
It was considered beneficial to preserve the existing waterway and vegetation through Lot 11 in its current
state. Flood modelling has shown that compensatory excavation is not required for flood alleviation
purposes.
Northbrook Corporation Pty Ltd Version 4 16 September 2013
Flood Study v4 2.doc Commercial in Confidence Page 27
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment 13- Amended Flood Study MCU12/0208Related documentApplication case desk ↗
About this file
- File size
- 37.1 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.