Swmp
0.97 395
Pipe Outlet 1 x 450mm RCP at RL0.0m
Weir Outlet 4m wide at RL.0.60m
Crest Level RL 0.97m
Q100 WSL RL0.80m
Freeboard 0.17m
Peak flows from the mitigated scenario modelling are presented in Table 2-7 with a
comparison against the existing peak flows. The results show that there is non-worsening for
events up the 10% AEP, with a minor increase noted in the larger events. The intent of sizing
the detention basin is to mitigate flows up to the 5% AEP storm event to ensure non-
worsening of discharges into the downstream flow path. In larger events, flows from the site
will start to sheet flow across the rear of the site to Cooroora Creek. As the discharge point
for the site becomes inundated from Cooroora Creek flooding in the major storm event (refer
Figure 1-2), it is considered that the very minor increases noted from the site become
inconsequential as a result of downstream site being drowned out by creek flooding.
The catchment size of Cooroora Creek reporting past the site is approximately 1,400 ha. The
very minor increases in peak flows in the major event would be considered to not result in
any quantifiable change to downstream flooding conditions.
Table 2-7: Comparison of Peak Flows Site A (Existing Vs. Mitigated)
Event AEP 63.2% 50% 20% 10% 5% 2% 1%
Existing (m3/s) 0.34 0.42 0.64 0.80 0.95 1.12 1.27
Mitigated (m3/s) 0.32 0.36 0.60 0.76 0.92 1.15 1.32
Change (m3/s) -0.03 -0.05 -0.04 -0.03 -0.02 0.03 0.04
Table 2-6 provides a summary of the basin configuration and it is noted there is 0.17m
freeboard from the 1% AEP flood level to the basin crest. A sensitivity analysis was undertaken
to assess the impact of 100% blockage of both basin outlet configurations. Under this
scenario the flood level rose to RL0.88m and demonstrates the spillway is able to convey the
1% AEP flows under fully blocked conditions without overtopping the embankment crest.
Given this and the fact that the land downstream of the detention basin will remain
undeveloped it is considered that the 0.17m from the 1% AEP flood level (and 0.4m from
spillway level) to dam crest level is acceptable.
It is noted that with the inclusion of 0.3m of Extended Detention Depth for the co-located
bioretention basin, the total Q20 depth for the basin is expected to be less than the 1.2m
recommended by QUDM for safety concerns.
Refer to Appendix B for summary of WBNM output.
21-0166SMP01-V1 | Stormwater Management Plan | 25 Pavilion Street, Pomona |8
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.