GENERAL COMMITTEE MEETING MINUTES 12 APRIL 2021
e. dimensions, crossfalls and gradients in accordance with Australian
Standards AS/NZS2890.1:2004 and AS/NZS2890.6:2009
31. All car parking areas and access driveways must be maintained exclusively
for vehicle parking and manoeuvring and kept in a tidy and safe condition
at all times.
32. Directional signage must be provided to direct visitors to the car parking
spaces provided on site.
Stormwater Drainage
33. The site must be provided with a stormwater drainage system connecting
to a lawful point of discharge. The works must be undertaken in
accordance with an Operational Works approval and be generally in
accordance with drawing number Q20-004-C01 Revision F titled
Stormwater Drainage Layout Plan prepared by Neil McKenzie and
Associates Pty Ltd dated 11 March 2021. The operational works application
must include but not be limited to:
a. Certification from the Geotechnical Engineer that supports the design
and makes specific comment regarding the proposed on-site
infiltration system and the swale drain
b. Certification that states that if the works are carried out in accordance
with the design plans the development of the site will not create a
stormwater worsening on the adjoining downstream properties
This condition is imposed pursuant to s145 of the Planning Act 2016 being
non-trunk infrastructure.
Services
34. Unless otherwise stipulated by telecommunications legislation at the time
of construction, the development must be provided with all necessary
conduits, pits and pipes to accommodate the future connection of optic fibre
technology telecommunications.
35. Certification must be submitted to Council from all relevant service
providers (Energex, NBN and Unitywater) which certifies that the
development has met the requirements of this Decision Notice and all
applicable legislation at the time of construction.
Easements
36. Unless otherwise agreed in writing by the relevant service provider, any
public or third party infrastructure located on the subject site must be placed
within an easement registered against the title of the property.
37. All easements must be designed in accordance with the planning scheme
and granted at no cost to the Grantee. Where the Grantee is Council or a
service authority, the easement documentation must be in accordance with
the Grantee’s standard easement terms. Draft easement documentation
must be submitted to Council for endorsement.
38. All works must be kept clear of any existing or proposed easements on the
subject land, unless agreed otherwise in writing by the Grantee.
Geotechnical Stability
39. All works must be carried out generally in accordance with the
recommendations contained in the Report on Geotechnical Investigation –
Project Number 95141.00 prepared by Douglas Partners dated January
2021 with the following additions:
Page 7 of 16