Original source · versioned page text
2022-04-21 Ordinary Meeting Agenda
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
ORDINARY MEETING AGENDA 21 APRIL 2022
b. the trafficable fire break trail to be maintained, include unlocked 4m wide gates allowing
access to Council and Fire Services and ensure compliance with the QLD SPP Bushfire
2019 firebreak trail specifications.
c. All future dwellings are to provide a dedicated 10,000 litre water supply for firefighting
purposes .
45. A Landholder Bushfire Information Kit is to be provided to all new owners detailing the
performance requirements of the trafficable firebreak fire trails
Road & Park Names
46. The proposed names of roads must be lodged with the application for a Development Permit
for Operational Works. Names are to be
a. Relevant to Australian, preferably local, history, flora, fauna, culture, landscape or
physical characteristics.
b. If used, personal names should commemorate persons who have contributed
significantly to the development of the region; demonstrated outstanding levels of civic
service; or achieved role-model status in the wider community or donated property or
funds for community benefit; and be recognised in memoriam.
c. Park names should be unique within the locality.
d. Approval will not be given to a name that may be construed as advertising, is more than
one word, understanding that a geographic relationship such as Cooroy Mountain is
permissible; is insensitive to diverse cultures and does not accord with community
standards; and is not concise, easy to pronounce and spell and be without accent marks,
apostrophes or hyphens.
e. Approval will not be given to a name that is the same or similar to the name of another
road in the Shire, or of a road in close proximity in a neighbouring Shire. Names that are
not easily pronounced, or may cause confusion to emergency services are to be avoided.
f. All street signs on new roads (public and private) and parks shall be erected prior to
works being accepted on maintenance.
Boundary Encroachments
47. Certification must be submitted to Council from a Licensed Surveyor which certifies that:
a. the setback/s to any new boundaries for any existing buildings remaining on the site
comply with the relevant provisions of the planning scheme and the Building Act 1975,
unless varied by this Decision Notice
b. all constructed access and roadworks (including associated fill batters and retaining
walls) are fully contained within a dedicated reserve or registered easement
c. all utility services and connections (eg. electricity, telecommunications, water, sewerage)
are wholly located within the lot they serve or alternatively included within an easement
d. all existing effluent disposal areas are wholly located within the lot they serve and comply
with the boundary setback requirements of the Plumbing and Drainage Act 2002 and
associated codes and requirements
e. all dams (including ponded water, dam walls and associated spillway structures) are
wholly located within the boundaries of a single lot
f. all retaining walls and structures are fully contained within the lot they retain any fill,
including fill batters, are wholly contained within the subject site and not on adjacent
properties
External Works
48. The table drains in the verge areas in the frontage of the subject site to Glenridge Drive must
be reconstructed to be free draining. The works must be undertaken in accordance with an
Operational Works approval and must include in particular:
Page 24 of 33
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.