Council archive · source document
07/2398 - Traffic report · 132007.2398
Phasing Summary SIDRA —~ INTERSECTION Phasing Summary Elm St / Diamond St Intersection (Signalised Option) 2019 PM Design C = 80 seconds Cycle Time Option: Optimum cycle time (Minimum Delay) Phase times determined by the program. Page 1 of 1 Phase H Phase G Phase I = towed bent —_ / Green Time = 30 seconds Green Time = 20 seconds Green Time = 12 seconds Phase Time = 36 seconds Phase Time = 26 seconds Phase Time = 18 seconds Phase Split = 45 % Phase Split = 33 % Phase Split = 23 % Normal Movement Slip-Lane Stopped Movement Turn On Red 4+ Permitted/Opposed Opposed Slip-Lane Continuous SIDRA SOLUTIONS Site: Design Signalised 2019 PM Elm at Diamond T:\3400-3499\3427 - Cooroy Retirement Community\SIDRA\Elm and Diamond Nov 28.aap Processed Nov 29, 2007 01:29:49PM A1059, McCormick Rankin Cagney, Large Office Produced by SIORA Intersection 3.2.1.1478 Copyright 2000-2007 Akcelik and Associates Pty Ltd www sidrasolutions.com about:blank 29/11/2007
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/2398 - Traffic reportRelated documentApplication case desk ↗
About this file
- File size
- 4.9 MB (large file)
- File type
- TIF
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.