* Annual monitoring shall be undertaken from the time of commissioning to determine
the quality of the wastewater produced from the effluent treatment system;
* Monitoring of the soils, vegetation and groundwater in the application area shall be
undertaken every three years to establish that such is not percolating into the
groundwater;
| * Sampling and testing shall be in accordance with relevant regulatory requirements and
manuals such as those provided by the Environmental Protection Agency, with testing
undertaken by an accredited Laboratory;
* Continuous monitoring shall be undertaken by the system for any water on the surface
of the application area, downslope resurfacing, changing plant growth on or around
the application area and any other signs of problems, and addressed through
maintenance or servicing.
(ii) A reserve disposal area 100% the size of the primary disposal area shall be nominated
and located outside required buffer areas. The locatiori shal! be provided as part of the
detailed design report at the Operational Works application stage.
(iit) A minimum of secondary standard effluent treatment with disinfection to achieve the
required microbiological quality (i.e. 200 cfu/100 mL with no sample over 1000
cfu/100mL) shall be adopted.
(iv) Detailed MEDLI modelling shall be undertaken at the operational Works application stage
to confirm the appropriate size for the effluent disposal area to ensure this is equal to
plant uptake, soil storage and environmentally acceptable release rates.
(v) More information on the source/s and respective volumes of wastewater produced during
bottling etc shall be provided in a detailed site-based stormwater management plan
(SBSWMP) at the Operational Works application stage, including monitoring of actual
wastewater production rates.
(vi) Washing plant, equipment or vehicles shall be undertaken off-site. If on-site washing of
any plant or equipment is necessary, all wastewater shall be collected in a sump and
disposed of off-site as trade waste by a registered operator.
(vii) Additional monitoring of wastewater discharge et Outflow Point 1 (G & S drawing H
J0085.1.7)} is to be carried out to demonstrate compliance with the desired SVSVWMP
water quality objectives in support of an operational Works approval, and on an on-going month,
basis to demonstrate continued compliance with SBSWMP water quality objectives. This
monitoring and assessment of the impact must be carried out compliance with the
Ecoaccess operational policy “Wastewater Discharge to Queensland Waters”.
(viii) Rehabilitation of the waterway of the site, as indicated by the 1997 Strategic Plan (Open
Space-Conservation & Waterway Protection) is to be undertaken in addition to replanting
as detailed in Drawing H J0085.1.2 of the Conceptual Site-Based Stormwater
Management Plan.
. 4of8
Page 42 of 200See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.