Skip to the record
The definitive source for everything Noosa Council.

Original source · versioned page text

2014-04-28 General Committee Meeting Agenda Pages 1-64

of 64

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

GENERAL COMMITTEE MEETING AGENDA   28 APRIL 2014




                                   Page 43 of 200

GENERAL COMMITTEE MEETING AGENDA                                                       28 APRIL 2014

   RR     nen ener nn nn eennnnnen nnn eenenee nn nnn nencncncnnnccc cnn                          i,
    18B. The Conceptual Effivent Treatment and Disposal Strategy prepared by Gilbert and Sutherland,
         dated October 2009 assumes a combined bottied/bulk water production volume of 24 ML/annum,
         which produces 7.2 MLannum of waste water. If the production rate increases over 24 ML/annum,
         additional seitiement ponds, chemical treatment and flocculation is required in addition to those
         measures specified in the Conceptual Effluent Treatment and Disposal Strategy and condition 184
         of this approval, These additional measures are to be achieved through larger (vertical) holding
         tanks and chemical dosing within the approved development footprint. Erosion & Sediment
         Control                 .
    19.  Any person acting on this permit shall prevent erosion and sediment export from leaving the site.
         Site control measures such as silt fencing, controlled gravel access to the site and controlled
         disposal of waste, will be necessary.  In this regard plans detailing the methods of controlling
         erosion and sediment are required to be submitted to the Council for approval prior to obtaining a
         Development Permit for Operational Works.
    General
    20.  For the following classes of work associated with development, a Development Permit for
         Operational Works must be obtained prior to commencement of works relating to that class of work.
         The application may combine any or all of these classes of work:-
          °        Access and/or Carparking.
          .        Roadworks,
          °        Stormwater Drainage.
          °        Frontage Works.
          °        Erosion & Sediment Control
    21.  A suitably qualified Registered Professional Engineer shall prepare engineering drawings and
          specifications for all engineering works that will become Council infrastructure, which shall be
          submitted in conjunction with an application for a Development Permit for Operational Works. In
          this regard a DXF/DWG file on GDA94 zone 56 grid of the proposed cadastre layout is to be
          submitted in conjunction with any application for Operational Works.
    22.   Digital detailed designs including drawings, calculations, specifications and a schedule of works,
          shall be submitted with any application for a Development Permit for Operational Works in respect
          of roadworks and stormwater drainage works. The design shall be in accordance with Council's
          Planning Scheme Policy PSPO5 — Engineering Design Standards - Roads, Drainage and
          Earthworks.  To avoid conflict with underground pipes or services, all existing and proposed
          services required by the development shall be shown on the plans.
    23.   To facilitate production of As Constructed drawings it is suggested that all design drawings are
          submitted in the Asset Design and As Constructed (ADAC) digital format. (Guidelines on the use of
          ADAC are available at www.adac.com.au).
    24.   As Constructed drawings and data shall be certified by a qualified experienced Civil Engineer for
          design intent, and a Licensed Surveyor shall certify the cadastre and the location, level and type of
          all services and structures. All of which shall be submitted to Council for checking and for Council's
          records,
          The data must fully detail levels for all engineering works including but not limited to drainage
          structures, finished ground levels and pavement surface levels. The data shall be submitted in the
          Asset Design and As Constructed (ADAC) digital format.   (Guidelines on the use of ADAC are
          available at www.adac.com.au},
          Approval of works shail not be granted until all As Constructed information has been supplied and
          accepted by Council.

                                                                                         5o0f8

                                                                                      Page 43 of 200
Log in to download the original file

2014-04-28 General Committee Meeting Agenda Pages 1-64(PDF, 6MB).pdf · 5.9 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.