PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 8 NOVEMBER 2016
91. Such monitoring must be undertaken within a reasonable and practicable timeframe
nominated by Council and be performed by a suitably qualified person in accordance
with accepted guidelines and standards. The report is to be submitted to Council
detailing the results of such monitoring and recommendations for any measures to
achieve compliance with limits outlined in Table 1 of this Decision Notice.
For the purpose of measuring and certifying relevant noise conditions and reporting
(e.g. mechanical plant and equipment, a/c units, motors, refrigeration equipment,
compressors, pumps, rooftop plant and equipment. etc) a suitably qualified person is
either:
a. a Registered Professional Engineer of Queensland, or
b. an environmental consultant with a minimum of three (3) years current
experience in the field of acoustics.
Rainwater/Detention Tanks
92. In accordance with the Public Health Act 2005, rainwater tanks (including the
detention tank) must be constructed with mosquito proof screens (made from either
brass, copper, aluminium or stainless steel), and constructed with a mesh size of no
more than 1mm, and must be installed in a way that does not accelerate corrosion.
Tanks that contain flap valves must be installed so that when closed, mosquitoes
cannot pass through the valve.
93. Where it is intended to use rainwater for drinking purposes, a suitable treatment
system is required to be installed to disinfect or treat the water to microbiological and
physical standards as described in the current Australian Drinking Water Guidelines
to make it fit for drinking purposes.
Compliance Certification Required for UPSS
94. Notwithstanding any other condition of this Decision Notice, a Certificate of
Compliance issued by a suitably qualified person* must be provided to Council prior
to commissioning the operation of the UPSS, that certifies the design, installation,
construction and operation of the underground petroleum storage system (Service
Station) complies in all respects with the conditions of this Decision Notice and any
relevant Australian Standards, Standard Test Procedures and Codes referred to
herein.
* A suitably qualified person is a Registered Professional Engineer of Queensland
with experience and knowledge in the design and operation of the storage and
dispensing of petroleum products and underground petroleum storage systems.
WASTE
Waste Disposal
95. The developer must provide waste storage and disposal facilities in accordance with
Planning Scheme Policy No. 9 “Waste Management Multi-Dwellings and Commercial
and Industrial Premises”. The facilities must include an external impervious area
correctly sized for all refuse and recycling containers and suitably screened from
public places and neighbouring properties. A bin wash area is required with a cold-
water tap, hose and drain outlet connected to sewer, via a bucket trap. The drain
outlet must be designed to prevent storm water entry to the sewerage system. This
can be achieved with a nib wall 50mm high and up to 700mm x 700mm wide (max
0.5m²), or alternatively the waste area can be roofed, or any other design approved
by Council.
96. Refuse containers must be provided in accordance with the requirements of the
Environmental Protection (Interim Waste) Regulation 1996 and (Waste Management)
Regulation 2000, for the storage and collection of refuse.
Page 18 of 70
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.