PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 8 NOVEMBER 2016
11. Copies of the approved plans, duly signed by the consultant Registered Professional
Engineer of Queensland (RPEQ) must be provided to Council’s Engineering Officer
Construction at the “prestart” meeting.
12. A detailed condition report including photographs of all frontages of the site must be
completed and submitted to Council prior to the prestart meeting.
13. A condition report including photographs of all fences and retaining walls bordering
the site and any buildings, structures, pathways, landscaping features etc on
adjoining properties that could potentially be impacted on by the proposed earthworks
and construction works must be completed and submitted to Council prior to the
prestart meeting.
14. A Construction Management Plan must be submitted to Council for approval prior to
the prestart meeting and must specifically include/address the following:
a. Traffic Management during all aspects of the construct phase including:
i. A Traffic Management Control Plan in accordance with Manual of Uniform
Traffic Control Devices (MUTCD) detailing all temporary signage and
traffic control measures to be installed prior to construction.
ii. Fencing to the work site during the construction phase to ensure the
safety of the public and the road users.
iii. Maintenance of safe pedestrians and cyclists access across the frontage
of the site both during daily construction and after daily construction has
ceased.
iv. Sufficient parking arrangements for trucks, machineries and construction
workers without adversely impacting on traffic flow and/or the availability
of on-street parking in the local street.
b. Maintenance and protection of water quality and existing drainage lines through
the construction site through the implementation of appropriate erosion and
sediment control measures.
c. Works programme identifying key components of the works and their respective
durations.
d. The proposed dates for the commencement and the completion of the works.
e. Effective procedures and measures to minimise adverse environmental impact
on other properties and roads users including noise and dust emission.
f. Establishment of a communication protocol with the adjoining owners and any
other affected parties to advise of construction times, impacts on traffic and
services and any other relevant issues.
g. Identification of communication and complaint management procedures
including:
i. Contact details for the on-site manager.
ii. Dispute resolution procedures.
15. Any changes to the details associated with the supervising RPEQ or Principal
Contractor during construction, must be notified to council in writing within five
business days of the change occurring.
16. Any alteration to existing services or conflict between the development and an
existing or proposed service must be referred to the relevant service authority for
determination prior to commencement of works.
Page 44 of 70
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.