PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 8 NOVEMBER 2016
DURING CONSTRUCTION
General
17. The developer must meet any costs to repair damage to any Council asset during
construction, where damage is a result of the development works. Damage to assets
must be repaired immediately where it creates a hazard to the community. In
circumstances where the damage does not create a hazard to the community, it must
be repaired immediately on completion of the works associated with the
development.
18. All works must be supervised by a Registered Professional Engineer of Queensland
(RPEQ) who is independent of the Developer and Principal Contractor, and they must
certify that all works conform to the Operational Works permit. Where municipal
works are involved, such confirmation must be submitted for the respective hold
points prior to any site inspection by Council Officers.
19. All works must be constructed and work procedure undertaken in accordance with:
a. The approved plans and conditions detailed in this Decision Notice.
b. All relevant Noosa Council Planning Scheme Policies, standard drawings,
standard specifications and guidelines, particularly PSP 5 – Engineering Design
Standards – Roads, Drainage and Earthworks.
c. The latest version of the Healthy Waterways document “Water Sensitive Urban
Design Technical Design Guidelines for South East Queensland” for all water
quality devices to be constructed on site.
Driveways
20. Driveway crossovers must be designed and constructed generally in accordance with
the approved plans and in accordance with IPWEA standard drawing RS- 051 and
must have levels and grades match the levels and the grades of the existing concrete
footpath without posing trip hazard.
21. The following must be complied with during the construction of the required
crossovers/driveways:
a. The driveway width must not exceed 6m at the front boundary line and 13m at
the kerb line.
b. The driveway surfacing must consist of either an approved hot mixed asphaltic
concrete or patterned/plain concrete and must have a slip resistant surface.
c. The driveway must be constructed so as not to concentrate stormwater runoff
or ponding onto other properties and/or the road verge.
d. For public safety, the finish levels of crossover must ensure smooth transition to
existing surfaces such as the road grassed verge and existing concrete
pathway.
e. Where applicable, underground service conduits for water supply, electricity
and any other services must be provided as part of the access driveway works.
f. Have a minimum clearance of 1.0m from any existing power poles, streetlights
or other signage.
g. Have a minimum clearance of 500mm from any Unitywater/Telstra asset,
unless a written approval is obtained from Unitywater/Telstra and submitted to
Council.
Page 45 of 70
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.