a) provide flood free access to premises and to an existing building or structure – floor levels
flood free habitable areas; of habitable rooms are—
b) allow only minor, short term and a) for areas where minimum floor levels are
infrequent flooding of non-habitable areas; available—not less than the specified
c) ensure the protection of persons and level;
property in the event of a flood and power b) for areas where flood modelling is
failure; available—a minimum of 300mm above
d) ensure drainage does not adversely the modelled flood level; and
impact upon other premises; and c) for areas where flood modelling is not
e) ensure filling, excavation or retaining available, a minimum of 300mm above
structures do not adversely impact upon the highest known flood level;20
other premises by— AND
i. causing ponding of water on the S2.2 Enclosed car parking and manoeuvring
site or nearby land; and areas are constructed at a level that permits the
ii. increasing flooding, which parking area to drain from the site by gravity
adversely affects the safety or use means, without the need for mechanical
of any land upstream and pumping;
downstream; and AND
iii. adversely affecting the flow of S2.3 Filling, other than accessways, does not
water in any overland flow path; extend more than 1m beyond the footprint of
iv. adversely affecting the privacy or any building, measured from the outer walls of
visual amenity of surrounding the building.
properties.
AND
O3 Finished surface levels ensure land is free S3.1 No solution provided
draining.
Editor’s note:
Council encourages building methods that
avoid the use of fill such as suspended floor
construction and stepping down slopes
rather than cutting and filling.
O4 Filling or excavation does not adversely S4.1 Fill material placed over services does not
affect sewer, stormwater or water utility impose any additional surcharge loading on the
infrastructure. service.
S4.2 Where excavation is carried out-
a) a minimum cover of 600mm is maintained
around all utility infrastructure (to top,
sides and base of services); or
b) a retaining wall is provided to support the
soil surrounding the service;
AND
S4.3 Compaction with a vibrating roller is not
carried out within 600mm of any utility
infrastructure.
O5 Development does not adversely impact S5.1 Buildings or other structures within the
on the Lake Macdonald water supply. Lake Macdonald catchment (indicated on Figure
14.7) are located above the 98.5m AHD level.
Services and Utilities
O6 The house is provided with infrastructure, S6.1 Where located in an urban zone, or a
20
Information on minimum floor levels and flood modelling can be obtained from Council.
14-59
Detached House CodeLow Density Housing Code
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.