                   column 1                                                 column 2
              Specific Outcomes                           Probable solutions (if code assessment)




                                                                                                                      Including amendments to 3 July 2017
                                                                                                          The Noosa Plan
      manner that allows roads to be trafficable       AND
      in Q100 ARI local rainfall events.               S8.3 Stormwater drainage planning, design and
                                                       construction is in accordance with the
                                                       Queensland Urban Drainage Design Manual.
O9 Roads and stormwater drainage                       S9.1 Roads and stormwater drainage
infrastructure is constructed—                         infrastructure is constructed in accordance
a)    in accordance with appropriate                   with—
      engineering standards; and                       a)    Sections 2, 3 and 4 of PSP5 Engineering
b)    to minimise adverse environmental                      Design Standards – Roads, Drainage and
      impacts, including from run-off and                    Earthworks;
      erosion.                                         b)    Queensland Design Code for Residential
                                                             Streets;
                                                       c)    AUSTROADS; or
                                                       d)    A combination of the principles in these
                                                             documents;
                                                       AND
                                                       S9.2 Erosion and sediment control measures
                                                       are designed and implemented in accordance
                                                       with the Institution of Engineers Australia
                                                       (Queensland Division) Soil Erosion and
                                                       Sediment Control - Guidelines for Queensland
                                                       Construction Sites.
Environmental Protection
O10 Roads and stormwater drainage                      S10.1 Roads and stormwater drainage follow
infrastructure are located and aligned so as to—       the edge of existing disturbed areas, or
a) minimise disturbance to native vegetation           alternatively, these works are co-located within
     and/or other habitat areas;                       a combined utility corridor;
b) protect and maintain wildlife corridor              AND
     movements and the safety of native fauna;         S10.2 Roads avoid native vegetation and
c) minimise changes to the hydrological                provide for fauna underpasses and associated
     regime, including drainage patterns, run-off      fencing where appropriate;
     and water quality;                                AND
d) avoid crossing watercourses, drainage               S10.3 Road infrastructure within or adjacent to
     lines and wetlands, but where such                native habitat incorporates fences which allow
     crossings are unavoidable, disturbed areas        for protected wildlife movement and controls
     are reinstated and revegetated on                 unrestricted access of domestic cats and dogs;
     completion of works; and                          AND
e) minimise bulk earthworks.                           S10.4 Native vegetation is protected from
                                                       clearing or construction activities by—
                                                       a) clearly marking vegetation to be retained
                                                             with flagging tap;
                                                       b) installing protective fencing around the
                                                             dripline of vegetation; and
                                                       c) ensuring stock piling, storage and vehicle
                                                             parking occur outside the areas of
                                                             vegetation to be retained;
                                                       AND
                                                       S10.5 Low impact construction techniques are
                                                       used around areas of vegetation to be retained
                                                       to minimise interference with the vegetation.
O11 Roads and stormwater drainage                      No solution provided
infrastructure is proven to be suitable for its use
prior to Council accepting the dedicated asset.
O12 Alignment of stormwater drainage                   S12.1 The location, design and construction of
infrastructure is to allow for easy access for the     stormwater drainage structures is in accordance
ongoing maintenance by Council.                        with Sections 4 and 5 of PSP5, Engineering
                                                       Design Standards - Roads, Drainage and


                                                   14-155
                                     Transport, Roads and Drainage Code

Used in these records

About this file

File size
9.9 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

2017-11-07 P&E Committee - Attachment 1 to Item 1 - Amendments for Multiple Housing Type 2 Duplex & Minor Corrections(PDF, 9MB).pdf · 9.9 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.