Minor Change Existing Approval MCU21/0156.03 [As Published]
Noise
26. Written certification is required from a suitably qualified person confirming that sound
pressure levels from all mechanical plant and equipment comply with the following:
a. Air-conditioning and Refrigeration
i. 7am to 10pm: Maximum level allowable = background + 5dB(A)
ii. 10pm to 7am: Maximum level allowable = background + 3dB(A)
b. Pumps
i. 7am to 7pm: Maximum level allowable = background + 5dB(A)
ii. 7pm to 10pm: Maximum level allowable = background + 3dB(A)
iii. 10pm to 7am: No audible noise.
27. The certification must be submitted to Council, which certifies that operational noise from any
fixed plant and equipment complies and with the requirements of this Decision Notice.
Waste Storage
28. The developer must provide waste storage and disposal facilities in accordance with
Planning Scheme Policy 9, Waste Management, including an external imperviously paved
area correctly sized for all refuse and recycling containers and suitably screened from public
places and neighbouring properties. A bin wash area is required with a cold-water tap, hose
and drain outlet connected to sewer, via a bucket trap. The drain outlet must be designed to
prevent storm water entry to the sewerage system.
29. Refuse containers must be provided in accordance with the requirements of the
Environmental Protection (Interim Waste) Regulation 1996 and (Waste Management)
Regulation 2000, for the storage and collection of refuse.
ENGINEERING
External Works
30. Eumundi Noosa Road must be upgraded at the frontage of the development site. The works
must be undertaken in accordance with an Operational Works approval and must include in
particular:
a. Extending the raised concrete central median so it extends 6m past the southern side
of the proposed crossover and making any necessary adjustments to surrounding line
marking at the frontage of the site to accommodate this median extension; and
b. Removal of the existing property access crossovers to 89, 91 and 93 Eumundi Noosa
Road and reinstatement of the kerb and channel.
This condition is imposed pursuant to s145 of the Planning Act 2016 being non-trunk
infrastructure.
31. Pedestrian and bicycle facilities must be provided for the development. The works must be
undertaken in accordance with an Operational Works approval and must include in particular:
a. Construction of a 2.0m wide concrete footpath and verge area to match the balance of
the site frontage, including the provision of topsoil and turf where the existing verge is
grassed generally in accordance with plan number 31131-C6.1 as prepared by SCG
Consulting Engineers.
This condition is imposed pursuant to s128 of the Planning Act 2016 being necessary trunk
infrastructure identified by Council’s LGIP to service the development.
Site Access and Driveways
32. A sealed access driveway must be provided from Eumundi Noosa Road to all parking and
manoeuvring areas of the development. The works must be undertaken in accordance with
an Operational Works approval and must include in particular:
Page 7 of 16
Document Set ID: 23576112
Version: 3, Version Date: 25/02/2025
[OCR of page images]
Noise
26. Written certification is required from a suitably qualified person confirming that sound
pressure levels from all mechanical plant and equipment comply with the following:
a. _ Air-conditioning and Refrigeration
i. 7am to 10pm: Maximum level allowable = background + 5dB(A)
ii. 10pm to 7am: Maximum level allowable = background + 3dB(A)
b. Pumps
i. 7am to 7pm: Maximum level allowable = background + 5dB(A)
ii. 7pm to 10pm: Maximum level allowable = background + 3dB(A)
iii. | 10pm to 7am: No audible noise.
27. Thecertification must be submitted to Council, which certifies that operational noise from any
fixed plant and equipment complies and with the requirements of this Decision Notice.
Waste Storage
28. The developer must provide waste storage and disposal facilities in accordance with
Planning Scheme Policy 9, Waste Management, including an external imperviously paved
area correctly sized for all refuse and recycling containers and suitably screened from public
places and neighbouring properties. A bin wash area is required with a cold-water tap, hose
and drain outlet connected to sewer, via a bucket trap. The drain outlet must be designed to
prevent storm water entry to the sewerage system.
29. Refuse containers must be provided in accordance with the requirements of the
Environmental Protection (Interim Waste) Regulation 1996 and (Waste Management)
Regulation 2000, for the storage and collection of refuse.
ENGINEERING
External Works
30. Eumundi Noosa Road must be upgraded at the frontage of the development site. The works
must be undertaken in accordance with an Operational Works approval and must include in
particular:
a. Extending the raised concrete central median so it extends 6m past the southern side
of the proposed crossover and making any necessary adjustments to surrounding line
marking at the frontage of the site to accommodate this median extension; and
b. Removal of the existing property access crossovers to 89, 91 and 93 Eumundi Noosa
Road and reinstatement of the kerb and channel.
This condition is imposed pursuant to s145 of the Planning Act 2016 being non-trunk
infrastructure.
31. Pedestrian and bicycle facilities must be provided for the development. The works must be
undertaken in accordance with an Operational Works approval and must include in particular:
a. Construction of a 2.0m wide concrete footpath and verge area to match the balance of
the site frontage, including the provision of topsoil and turf where the existing verge is
grassed generally in accordance with plan number 31131-C6.1 as prepared by SCG
Consulting Engineers.
This condition is imposed pursuant to s128 of the Planning Act 2016 being necessary trunk
infrastructure identified by Council’s LGIP to service the development.
Site Access and Driveways
32. A sealed access driveway must be provided from Eumundi Noosa Road to all parking and
manoeuvring areas of the development. The works must be undertaken in accordance with
an Operational Works approval and must include in particular:
Page 7 of 16
Document Set ID: 23576112
Version: 3, Version Date: 25/02/2025
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Minor Change Existing Approval MCU21/0156.03 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 200 KB (small file)
- File type
No other editions are linked here.