Minor Change Existing Approval MCU21/0156.03 [As Published]
a. A driveway crossover generally in accordance with plan numbers 31131-C6.1 & 31131-
C6.2 as prepared by SCG Consulting Engineers and Councils Standard Drawing RS-
051.
Car Parking
33. A minimum of 34 car parking spaces must be provided and marked on the site. The works
must be undertaken in accordance with an Operational Works approval and must include in
particular:
a. A minimum of 34 covered parking spaces within the total;
b. A minimum of 8 visitor parking spaces within the total, which are clearly marked for that
purpose and accessible at all times for visitor use;
c. 1 disabled parking space/s within the total; and
d. Dimensions, crossfalls and gradients must be in accordance with Australian Standard
AS2890: Parking Facilities.
34. Suitable ingress and egress to visitor car spaces must be demonstrated with any Operational
Works application. If this cannot be achieved, amended plans relating to this approval must
be submitted.
Stormwater Drainage
35. The site must be provided with a stormwater drainage system connecting to a lawful point of
discharge. The works must be undertaken in accordance with an Operational Works approval
and the Queensland Urban Drainage Manual and be generally in accordance with SCG’s
Stormwater Management Plan, ref. 31131 (SWMP), Rev B, dated 02/03/2022 and plan
numbers 31131-SW1.1 Rev B, 31131-SW1.2 and 31131-SW1.5 as prepared by SCG
Consulting Engineers.
Services
36. Underground reticulated electricity and telecommunication services must be provided to
each unit in accordance with an approval for Operational Works and the standards and
requirements of the relevant service provider.
37. Unless otherwise stipulated by telecommunications legislation at the time of construction, the
development must be provided with all necessary conduits, pits and pipes to accommodate
the future connection of optic fibre technology telecommunications.
38. Certification must be submitted to Council from all relevant service providers (Energex, NBN
and Unitywater) which certifies that the development has met the requirements of this
Decision Notice and all applicable legislation at the time of construction.
Easements
39. Unless otherwise agreed in writing by the relevant service provider, any public or third party
infrastructure located on the subject site must be placed within an easement registered
against the title of the property.
40. All easements must be designed in accordance with the planning scheme and granted at no
cost to the Grantee. Where the Grantee is Council or a service authority, the easement
documentation must be in accordance with the Grantee’s standard easement terms. Draft
easement documentation must be submitted to Council for endorsement.
41. All works must be kept clear of any existing or proposed easements on the subject land,
unless agreed otherwise in writing by the Grantee.
Page 8 of 16
Document Set ID: 23576112
Version: 3, Version Date: 25/02/2025
[OCR of page images]
33.
34.
35.
36.
37.
38.
39.
40.
41.
a. | Adriveway crossover generally in accordance with plan numbers 31131-C6.1 & 31131-
C6.2 as prepared by SCG Consulting Engineers and Councils Standard Drawing RS-
051.
Car Parking
A minimum of 34 car parking spaces must be provided and marked on the site. The works
must be undertaken in accordance with an Operational Works approval and must include in
particular:
a. | Aminimum of 34 covered parking spaces within the total;
b. | Aminimum of 8 visitor parking spaces within the total, which are clearly marked for that
purpose and accessible at all times for visitor use;
1 disabled parking space/s within the total; and
Dimensions, crossfalls and gradients must be in accordance with Australian Standard
AS2890: Parking Facilities.
Suitable ingress and egress to visitor car spaces must be demonstrated with any Operational
Works application. If this cannot be achieved, amended plans relating to this approval must
be submitted.
Stormwater Drainage
The site must be provided with a stormwater drainage system connecting to a lawful point of
discharge. The works must be undertaken in accordance with an Operational Works approval
and the Queensland Urban Drainage Manual and be generally in accordance with SCG’s
Stormwater Management Plan, ref. 31131 (SWMP), Rev B, dated 02/03/2022 and plan
numbers 31131-SW1.1 Rev B, 31131-SW1.2 and 31131-SW1.5 as prepared by SCG
Consulting Engineers.
Services
Underground reticulated electricity and telecommunication services must be provided to
each unit in accordance with an approval for Operational Works and the standards and
requirements of the relevant service provider.
Unless otherwise stipulated by telecommunications legislation at the time of construction, the
development must be provided with all necessary conduits, pits and pipes to accommodate
the future connection of optic fibre technology telecommunications.
Certification must be submitted to Council from all relevant service providers (Energex, NBN
and Unitywater) which certifies that the development has met the requirements of this
Decision Notice and all applicable legislation at the time of construction.
Easements
Unless otherwise agreed in writing by the relevant service provider, any public or third party
infrastructure located on the subject site must be placed within an easement registered
against the title of the property.
All easements must be designed in accordance with the planning scheme and granted at no
cost to the Grantee. Where the Grantee is Council or a service authority, the easement
documentation must be in accordance with the Grantee’s standard easement terms. Draft
easement documentation must be submitted to Council for endorsement.
All works must be kept clear of any existing or proposed easements on the subject land,
unless agreed otherwise in writing by the Grantee.
Page 8 of 16
Document Set ID: 23576112
Version: 3, Version Date: 25/02/2025
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Minor Change Existing Approval MCU21/0156.03 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 200 KB (small file)
- File type
No other editions are linked here.