ORDINARY MEETING AGENDA 21 JANUARY 2021
Finance
a. Capital costs
The below table identifies the estimated project capital costs of the Rufous St Stage 3 project
and details the community house and greenspace tendered elements.
Table 1. Rufous Street Stage 3 Capital Costs
Project Element Cost
Planning $265,482
Design $373,821
Approvals $25,150
Procurement $59,827
Construction
Water Main $116,373
Carpark $394,861
Community House and Greenspace
Ri-con Contractors D&C costs to date in Trust $174,545
Site costs to date (UXO, fencing, Unity water charges) $12,766
Kane Constructions (This contract) $3,039,764
Digital Hub Expansion $459,000
SUB TOTAL $4,996,761
5% Contingency on remaining works $193,474
TOTAL $5,190,776
TOTAL PROJECT BUDGET $5,213,994
b. Whole of life cost analysis
In accordance with Council’s internal policy, a detailed analysis of the expected operating,
maintenance, and depreciation for the Peregian Beach Community House and greenspace
infrastructure and services is under development. The methodology and analysis are well-
developed, with preliminary operating and maintenance cost forecasts developed to reflect
expected levels of service for the assets, along with consideration of more direct, fixed
operational costs (such as electricity, insurance, cleaning) that rely on recent experience with
similar Council infrastructure.
Specifically, the whole of life costing considers:
Annual operating costs – the ongoing costs required to keep the asset in operation.
Annual maintenance costs – the ongoing costs required to keep the asset at a desired
condition level.
Depreciation – consumption of assets and infrastructure over an estimated useful life.
Based on current estimated construction costs, the analysis is outputting annual maintenance
and operating costs in the vicinity of $250k per annum, with ongoing depreciation expense in
the vicinity of $150k per annum (with a detailed breakdown by asset type yet to be finalised).
Assuming a total future ongoing operating budget impact of $400k, this equates to a general
rate impact of approximately 0.8% that will be partially realised in the 2021/22 budget once the
project is completed and commissioned.
The analysis takes a conservative approach regarding operations and maintenance to ensure
that Council can appropriately and adequately consider financial sustainability impacts on
Council and the community.
A new lease is to be established with the Peregian Beach Community House that will consider
the new operational costs and any potential opportunities to offset.
Page 14 of 26
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.