Infrastructure, including, access, parking, sewerage and water services
11.1 Prescribed tidal work has appropriate infrastructure, The infrastructure for prescribed tidal work is consistent with each Complies – works will be undertaken in
including, in particular, road access, parking facilities, relevant planning scheme standard. accordance with a Construction management
sewerage services and water services, having regard plan which will detail requirements for traffic
to— management, access and services.
(a) the nature and scale of the work; and
(b) the number of people that may be on or at the work
at any time; and
(c) the number of vehicles that may be on or moored at
the work at any time; and
(d) the protection of any foreshores near the work and
the vegetation and marine plants on the foreshores.
Design, construction and safety—all prescribed tidal work
12.1 Prescribed tidal work is designed and constructed The design and construction of the prescribed tidal work is consistent The sewer rising main has been designed in
in a way to ensure it is structurally sound, having regard with the following standards— accordance with relevant Australian Standards,
to the following— (a) subject to paragraph (b), each Australian Standard relevant to the Unitywater standards, SEQ Standards etc.
(a) relevant engineering standards; design or construction of structures, to the extent requirements stated
(b) the location of the work; in the Standard apply to the design or construction of prescribed tidal
(c) the purpose for which the work is to be used; work;
(d) the impact of flooding, tidal influences and (b) if a relevant planning scheme standard is more stringent than any
hydrodynamic changes standard mentioned in paragraph
(a)—the relevant planning scheme standard, to the extent it is more
stringent than the standard mentioned in paragraph (a).
12.2 Prescribed tidal work does not adversely affect the The design and construction of the prescribed tidal work is consistent Complies – the works do not impact on any
structural integrity of any existing revetment or seawall or with the following standards— seawall or another existing structure. The works
another existing structure. (a) subject to paragraph (b), prescribed tidal work, including any shore are mostly directionally drilled to reduce impacts.
abutment, piling or other structure connected with the work—
(i) does not place an additional load on any existing revetment or
seawall or another existing structure; or
(ii) can be structurally supported by an existing revetment or seawall
or another existing structure;
(b) if a relevant planning scheme standard is more stringent than the
standard mentioned in paragraph (a)—the relevant planning
scheme standard, to the extent it is more stringent
than the standard mentioned in paragraph (a).
12.3 Prescribed tidal work is designed and constructed The design and construction of the prescribed tidal work is consistent Complies – the works do not impact on the
in a way to ensure it does not adversely affect the with the following standards— stability of the bed and banks of any tidal water.
IDAS Code Responses_Rising Main Works_MossmanCourttoSerenityClose pg. 6
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
IDAS Code responses.pdfRelated documentApplication case desk ↗
About this file
- File size
- 388 KB (small file)
- File type
No other editions are linked here.