_____________________________________________________________________________________________________________Callaghan and Toth Pty Ltd
stability of the bed and banks of any tidal water. (a) subject to paragraph (b), prescribed tidal work does The works are mostly directionally drilled to
not cause, by changing the flow of water, the removal reduce impacts. On the Mossman Court park the
of, or disturbance to, the sediment on the bed and banks of any tidal work is close to the banks but stability of the
water; banks will not be compromised as the launch pit
(b) if a relevant planning scheme standard is more stringent than the will be filled and rehabilitated. On the Serenity
standard mentioned in paragraph (a)—the relevant planning Close side of works the exit pit is approximately
scheme standard, to the extent it is more stringent 100m from the banks of Weyba Creek.
than the standard mentioned in paragraph (a).
12.4 Prescribed tidal work is designed and constructed The design and construction of the prescribed tidal work is consistent Complies – the rising main will be constructed
using materials having a long life in marine with the following standards— from polyethylene pipe which complies with
environments, having regard to their ability to resist (a) subject to paragraph (b), each Australian Standard relevant to the current standards.
the following— materials that should be used, or the measures that should be taken to
(a) attack by marine organisms; treat materials used, for structures, to the extent the requirements
(b) corrosion; stated in the Standard apply to structures located in a marine
(c) deterioration resulting from abrasion or immersion in environment;
seawater. (b) if a relevant planning scheme standard is more stringent than the
standard mentioned in paragraph(a)—the relevant planning scheme
standard, to the extent it is more stringent than the standard mentioned
in paragraph (a).
12.5 Prescribed tidal work is designed and constructed The design and construction of the prescribed tidal work is consistent N/A
in a way to ensure it does not adversely affect the with the following standards—
operation or maintenance of any existing stormwater (a) subject to paragraph (c), vessels moored at prescribed tidal work
outlet. do not impede the discharge of stormwater;
(b) subject to paragraph (c), prescribed tidal work does not restrict
access to any stormwater outlet;
(c) if a relevant planning scheme standard is more stringent than the
standard mentioned in paragraph (a) or (b)—the relevant planning
scheme standard, to the extent it is more stringent
than the standard mentioned in paragraph (a) or (b).
12.6 Prescribed tidal work is designed and constructed The design and construction of the prescribed tidal work is consistent The works will be completed in accordance with a
in a way to ensure it does not adversely affect the water with the following standards— Construction EMP which will ensure works are
quality of any tidal water, including, in particular, as a (a) subject to paragraph (b), each Australian Standard relevant to the completed in accordance with relevant standards
result of— design or construction of structures under, within or over tidal water, to and in compliance with water quality
(a) release, into the tidal water, of materials used in the the extent the requirements stated in the Standard are directed at requirements of the EPP Water, QLD Acid Sulfate
construction of the work; or maintaining the water quality of tidal water; Soils Guidelines, E&SC best practice etc.
(b) disturbance to the sediment on the bed and banks of (b) subject to paragraph (b), each Australian Standard relevant to the
the tidal water; or design or construction of structures under, within or over tidal water, to
(c) exposure to acid sulphate soils. the extent the requirements stated in the Standard are directed at
maintaining the water quality of tidal water;
IDAS Code Responses_Rising Main Works_MossmanCourttoSerenityClose pg. 7
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
IDAS Code responses.pdfRelated documentApplication case desk ↗
About this file
- File size
- 388 KB (small file)
- File type
No other editions are linked here.