Skip to the record
Accept no imitations.

Council archive · source document

IDAS Code responses · OPW15/0240

Attached to the e-mail OPW15/0240 - Operational Works Application.

of 17

Text shows just the words. Original shows the document exactly as it was published.

_____________________________________________________________________________________________________________Callaghan and Toth Pty Ltd


12.7 Prescribed tidal work is designed and constructed          The design and construction of the prescribed tidal work is consistent    N/A
in a way to ensure it is safe for persons standing or           with the following standards—
walking on the work.                                            (a) subject to paragraph (c), any surface of prescribed tidal work on
                                                                which a person may stand or walk is—
                                                                  (i) not slippery; and
                                                                  (ii) does not have any feature that may cause the person to trip or
                                                                fall;
                                                                (b) subject to paragraph (c), any part of prescribed tidal work that is
                                                                unsafe for persons standing or walking on the work is surrounded by
                                                                adequate barriers to deter persons from entering the part;
                                                                (c) if a relevant planning scheme standard is more stringent than the
                                                                standard mentioned in paragraph (a) or (b)—the relevant planning
                                                                scheme standard, to the extent it is more stringent than the standard
                                                                mentioned in paragraph (a) or (b).
12.8 Appropriate measures are taken for prescribed tidal        The design and construction of the prescribed tidal work is consistent    N/A
work for a non-private purpose to ensure a                      with the following standards—
unsupportable live load is not applied to the work by           (a) subject to paragraph (b), prescribed tidal work has erected or
persons or vehicles.                                            placed in position on or near the work, a sign that—
                                                                  (i) is visible at all times; and
                                                                  (ii) states the maximum live load that may be applied to the work, in
                                                                terms of the maximum number of persons that may be on the work at
                                                                any given time or the maximum number of vehicles of a particular
                                                                type that may be on or moored at the work at any given time;
                                                                (b) if a relevant planning scheme standard is more stringent than the
                                                                standard mentioned in paragraph
                                                                (a)—the relevant planning scheme standard, to the extent it is more
                                                                stringent than the standard mentioned in paragraph (a).
12.9 Prescribed tidal work, other than a boardwalk or an        The design and construction of the prescribed tidal work is consistent    Complies – works designed and constructed in
independent deck for a private purpose, is designed and         with each relevant planning scheme standard.                              accordance with relevant standards for sewer
constructed in a way that ensures the use of tidal water                                                                                  rising mains.
in a canal for a non-maritime purpose is minimised.
12.10 Prescribed tidal work that is a boardwalk or an           (s 6(2) solution)                                                         N/A
independent deck and for a private purpose, is designed         The design and construction of the boardwalk or deck is consistent
and constructed in a way that ensures the use of tidal          with the following standards—
water in a canal for a non-maritime purpose is                  (a) subject to paragraph (c), a boardwalk or independent
minimised.                                                      deck does not extend more than 3m from the waterfront
                                                                boundary of the lot connected to the boardwalk
                                                                or deck;
                                                                (b) subject to paragraph (c), a boardwalk or independent deck is at


IDAS Code Responses_Rising Main Works_MossmanCourttoSerenityClose                                                                                                      pg. 8

Used in these records

About this file

File size
388 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

IDAS Code responses.pdf · 388 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.