Council archive · source document
IDAS Code responses · OPW15/0240
Attached to the e-mail OPW15/0240 - Operational Works Application.
_____________________________________________________________________________________________________________Callaghan and Toth Pty Ltd
12.7 Prescribed tidal work is designed and constructed The design and construction of the prescribed tidal work is consistent N/A
in a way to ensure it is safe for persons standing or with the following standards—
walking on the work. (a) subject to paragraph (c), any surface of prescribed tidal work on
which a person may stand or walk is—
(i) not slippery; and
(ii) does not have any feature that may cause the person to trip or
fall;
(b) subject to paragraph (c), any part of prescribed tidal work that is
unsafe for persons standing or walking on the work is surrounded by
adequate barriers to deter persons from entering the part;
(c) if a relevant planning scheme standard is more stringent than the
standard mentioned in paragraph (a) or (b)—the relevant planning
scheme standard, to the extent it is more stringent than the standard
mentioned in paragraph (a) or (b).
12.8 Appropriate measures are taken for prescribed tidal The design and construction of the prescribed tidal work is consistent N/A
work for a non-private purpose to ensure a with the following standards—
unsupportable live load is not applied to the work by (a) subject to paragraph (b), prescribed tidal work has erected or
persons or vehicles. placed in position on or near the work, a sign that—
(i) is visible at all times; and
(ii) states the maximum live load that may be applied to the work, in
terms of the maximum number of persons that may be on the work at
any given time or the maximum number of vehicles of a particular
type that may be on or moored at the work at any given time;
(b) if a relevant planning scheme standard is more stringent than the
standard mentioned in paragraph
(a)—the relevant planning scheme standard, to the extent it is more
stringent than the standard mentioned in paragraph (a).
12.9 Prescribed tidal work, other than a boardwalk or an The design and construction of the prescribed tidal work is consistent Complies – works designed and constructed in
independent deck for a private purpose, is designed and with each relevant planning scheme standard. accordance with relevant standards for sewer
constructed in a way that ensures the use of tidal water rising mains.
in a canal for a non-maritime purpose is minimised.
12.10 Prescribed tidal work that is a boardwalk or an (s 6(2) solution) N/A
independent deck and for a private purpose, is designed The design and construction of the boardwalk or deck is consistent
and constructed in a way that ensures the use of tidal with the following standards—
water in a canal for a non-maritime purpose is (a) subject to paragraph (c), a boardwalk or independent
minimised. deck does not extend more than 3m from the waterfront
boundary of the lot connected to the boardwalk
or deck;
(b) subject to paragraph (c), a boardwalk or independent deck is at
IDAS Code Responses_Rising Main Works_MossmanCourttoSerenityClose pg. 8
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
IDAS Code responses.pdfRelated documentApplication case desk ↗
About this file
- File size
- 388 KB (small file)
- File type
No other editions are linked here.