Council archive · source document
Negotiated Decision Notice - 010.2008.00000110.001 [As Published] · 132008.110
2008/110
Service Easements (Sewer)
41. A registered easement shall be created over the zone of influence of all sewers within the
subject site and over those parts of the subject site that are impacted upon by sewers on any
adjoining sites. The easements shall generally be parallel to and centred over the sewer main
and be equivalent in width to twice the depth to invert level of the sewer at the deepest point
within the allotment (measured from the finished surface) and be no less than 3.0m wide
overall. In this regard a licensed surveyor shall accurately locate all sewer mains and
determine the necessary width of the easement, which shall be shown on any plans submitted
for Operational Works and Building Works approval. To this extent the surveyor shall certify
that the sewer and the zone of influence is wholly contained within the easement to be
created.
In addition to this the Applicant’s Solicitor shall give Council’s Solicitor an appropriate
undertaking in writing that the Title Deed and the easement documents will be lodged at the
Land Titles Office and any additional Titles Office forms or requisitions requiring the consent of
Council will be attended to promptly.
A duly executed copy of the easement shall be submitted to Council for perusal prior to the
use commencing.
Any changes required by Council’s Solicitor must be corrected immediately.
42. No building or other structure shall be constructed or encroach over an easement.
Earthworks
43. Filling works required on site shall be carried out in accordance with Council’s Planning
Scheme Policy PSP5 – Engineering Design Standards, so as not to cause the additional
ponding of water on any adjoining lands or the blockage of, or interference with, any natural
watercourses. Detailed site surveys indicating natural surface levels and contours of the
adjoining properties must be provided with the application for a Development Permit for
Operational Works for Filling and Drainage.
This may require the design and construction of drainage pipes and/or an overland flow-path
within the development site that caters for drainage from the adjoining sites for a design storm
with an Average Recurrence Interval of 1 in 100 years. A private easement for the Drainage of
Water encompassing the drainage pipes or overland flow-path may also be required. In this
regard a Development Permit for Operational Works shall be obtained.
Should evidence be provided to Council indicating that no additional ponding of stormwater
will occur on the adjoining properties the requirement for the drainage pipes, overland flow-
path and easement shall not apply.
44. Earthworks carried out on site shall not affect the structural integrity of any of the existing
fences or structures that border the development site. Fences that are affected shall be
replaced prior to the Building Certifier issuing the Certificate of Classification. In this regard
any fences to be replaced shall be clearly shown on the plans submitted for Operational
Works approval.
Acid Sulfate Soils
3
45. As the site is located below the 5m AHD, any excavation works consisting of 100m or greater
3
and/or any filling works consisting of 500m or greater and with an average depth of 0.5m or
greater will need to be carried out in accordance with State Planning Policy 2/02 Planning and
Managing Development Involving Acid Sulfate Soils. In this regard appropriate testing and
supporting documentation prepared by a suitably qualified specialist shall be submitted to
Council for approval prior to obtaining a Development Permit for Operational Works if
applicable.
6 of 14
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Negotiated Decision Notice - 010.2008.00000110.001 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 82 KB (small file)
- File type
No other editions are linked here.