PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 9 FEBRUARY 2021
iv. approval of the Traffic Management Control Plan by the Department of
Transport and Main Roads (DTMR) for any works on State controlled roads
v. provision for worker car parking
b) maintenance and protection of water quality and existing drainage lines through
the construction site, through the implementation of appropriate erosion and
sediment control measures;
c) works programme identifying key components of the works and their respective
durations;
d) establishment of a communication protocol with the general public, adjoining
owners, emergency services and local businesses to advise of agreed construction
times, impacts on traffic, services and other relevant issues;
e) a post out to the local residents and businesses prior to the pre-start meeting
advising of the site contact details and the potential for off-site impacts during the
developments construction. The post out must:
i. include a copy of the architectural approved plans;
ii. include plans that show any impacts on the road network;
iii. be distributed to all businesses and residences in the area bounded by:
adjoining property; and
Halse Lodge (Lot 2 RP865533)
Written confirmation of the post out must be submitted to Council a minimum of 5
days prior to the pre-start meeting.
f) include signage in prominent locations on the boundaries of the site advising of the
proposed development, the expected time frames and the site contact details;
g) identification of complaint management procedures including:
i. contact details for the on-site manager
ii. dispute resolution procedures
h) details on the location of external fill/dump sites, the haulage route, type of vehicle
to be utilised during operations and frequency of usage. NB any damage to the
existing road system as a result of haulage operations shall be fully repaired at the
applicant’s expense;
i) it is acknowledged that the preliminary Construction Management Plan will be a
draft document requiring finalisation upon appointment of the Principal Contractor
employed to construct the works and a final document will be required to be
submitted at the Pre-Start Meeting for the project.
Page 10 of 98
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.