Original source · versioned page text
ANNUAL PERFORMANCE REPORT INCLUDING Q4 OPERATIONAL PLAN 2023-24 PROGRESS REPORT · Attachment 2 - Q4 Operational Plan Progress Report-KPI Graphs Final
Plans and drawings: the text below has words only, no drawings.
OUR CUSTOMERS OUR CUSTOMERS Total number of development applications Number of development applications decided decided within the statutory timeframe 35 100% 90% 30 80% 25 70% 60% 20 50% 15 40% 30% 10 20% o MeMD A TeREEDE ARERR WaH TRO GTRE ais a Jan-24 Feb-24 Mar-24 Apr-24 May-24 Jun-24 Jan-24 Feb-24 Mar-24 Apr-24 May-24 Jun-24 mw MCU mw RAL m MCU m RAL = DEW m Concurrency Agency Referral gw DBW mw Concurrency Agency Referral m Op Works wm Plan Seal = Op Works m Plan Seal = Minor Changes gi Minor Changes Commentary: COMASTENY: a ; Decisions made within timeframes are relatively consistent with the previous Development applications have been relatively static for most months . the quarter, with all MCUs decided within statutory timeframes except for May year but peaked at 94 in May. Additionally, 23 more development applications achieving 78%. were decided In Q4 compared to Q3.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the original