Council archive · source document
0 141219 Rtcda Cooroy Cover Letter · 132007.2398
Attached to the e-mail 132007.2398.02 Request to change existing approval (1 of 3) Cover letter and site, floor & elevation plans.
& Paim Lake WOTkKS & Palm Lake’ YW Paim Lake , Keone ke Pa ake Group Snr logical access to the aged care facility and allows the use to operate separately to the adjoining retirement community. This proposed relocation results in no need for staff and visitors for the aged care facility to traverse the retirement community and allows convenient access to the facility just off Eim Street. The proposed access driveways and parking area for the amended aged care facility have been supported in the attached Traffic Report (Appendix 1). The proposed layout of the single storey aged care facility allows every ensuited and oversized room to gain direct access to open space and be sufficiently setback from the property boundaries. The design of this facility is based on the proven successful design principles of other existing Palm Lake Care facilities. Please refer to Appendix E for the proposed Aged Care Facility Plans prepared by Interworks Architects. Acoustics A new Acoustic report has been prepared for this proposed amended development. The results and recommendations of the assessment by ASK Consulting are as follows: e Anise barrier is proposed for the roadside boundaries. The barrier is modelled as 2.0 metres to 3.5 metres high based on the proposed ground levels provided to ASK. It is noted that the proposed noise barrier along Elm Street that is 3.5m high is very long and relatively high for what appears to be a road carrying only minor to moderate traffic volumes. This is due in part to the strict noise criterion being a quiet area, and the undulating terrain. It is noted that in the previous ASK noise report for this site, the barrier height was restricted to 2.1m, resulting in higher noise exposures at dwellings but accommodating this through more significant acoustic upgrades for the dwellings. It is likely that any relaxation of the barrier height would require acceptance from TMR and Council. It is requested that a reduction in the 3.5m barrier fence be considered by TMR and Council and alternatively allowing the 2.1m high fence with additional acoustic barriers through use of building materials (e.g double glazed windows). Palm lake Works wish to discuss this option further with TMR and Council. e To achieve the target noise reductions from external noise to internal noise levels in MP4.4 will require the construction details are of an appropriate acoustic standard, and that all external openings to be closed when these habitable rooms are occupied. e To achieve the target noise reductions from external noise to internal noise levels in MP4.4 will require the construction details are of an appropriate acoustic standard, and that all external openings to be closed when these habitable rooms are occupied. Therefore, an_air- conditioning/mechanical ventilation system that does not degrade the internal acoustic environment or the sound isolation of the building envelope, and also meets the ventilation requirements of the Building Code of Australia may need to be installed. Compliance with the above recommendations is predicted to result in compliance with relevant noise criteria. Please refer to Appendix J for a copy of the Acoustic Report prepared by ASK Consulting Page 5 of 22 Palm Lake Works | Southport Central Tower 3, 9 Lawson Street, Southport QLD 4215 | PO Box 10479, Southport BC QLD 4215 P (07) 5552 1300 | W www.PalmLakeResort.com.au | W www.PalmLakeCare.com Palmlake Works Pty Ltd trading as Palm Lake Works | ACN 095 986 119 | ABN 14 095 986 119 Works
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
0 141219 RTCDA COOROY COVER LETTER.pdfRelated documentApplication case desk ↗
About this file
- File size
- 4.6 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.