EMP – CONSTRUCTION PHASE 4-1
4 EMP – CONSTRUCTION PHASE
This section of the EMP has been broken into the following elements:
Legislative compliance (including compliance with
4.1 Element C.1
conditions)
4.2 Element C.2 Vegetation Protection and Management
4.3 Element C.3 Fauna, Fauna Habitat and Aquatic Ecosystem Protection)
4.4 Element C.4 Weed and Pest Control Plan
Soil Erosion and Sediment Control Plan and Stormwater and
4.5 Element C.5
Water Quality Management Plan
4.6 Element C.6 Air Quality Management
4.7 Element C. 7 Noise and Vibration Management
4.8 Element C.8 Waste Management
4.9 Element C.9 General and Visual Amenity Protection
4.10 Element C.10 Bushfire Control
4.11 Element C.11 Cultural Heritage Management
4.12 Element C.12 Community Liaison and Feedback
Construction Management Plan (including Traffic
4.13 Element C.13
Management Plan)
4.14 Element C.14 Acid Sulphate Soils Management Plan
4.15 Element C.15 Storage & Handling of Hazardous Substances
G:\ADMIN\B15184.G.DAH\R.B15184.001.05..DOC 22/7/05 10:07
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.