Minor Change Existing Approval MCU21/0228.02 & OPW21/0364.02 [As Published]
d. The data must be in accordance with Council’s “Planning Scheme Policy 6 –
Engineering Design Standards”, and fully detail the levels for all engineering works
including but not limited to the drainage network and structures, finished ground and
pavement surface levels.
On Maintenance
80. All municipal works must be accepted ‘On Maintenance’ by Council in accordance
with Council’s relevant Planning Scheme Policy prior to the commencement of the
use. To achieve ‘On Maintenance’, the supervising RPEQ must submit to Council:
a. certification that all works have been undertaken and completed in accordance with the
requirements of this Permit
b. as Constructed details in accordance with Council’s Planning Scheme Policy
c. maintenance and operational manuals for all proprietary or site specific devices
Off Maintenance
81. Prior to requesting an Off Maintenance inspection the developer must provide a written
request for the Off Maintenance inspection.
82. A re-inspection fee in accordance with Council’s Fees and Charge Register will be charged
where:
a. a Council inspection reveals works do not comply with approval requirements
b. submitted certification falsely states works comply with approval requirements.
83. A final inspection and approval of the new works and any completed reinstatement works by
Council’s Inspector is required. Please contact Council on 5329 6500 to arrange for the
inspection.
5. REFERRAL AGENCIES
The referral agencies applicable to this application are:
Referral Status Referral Agency and Referral Trigger Response
Address
Concurrence SARA at DILGP SARA Schedule 10, Part 4, The agency provided its
at DILGP Via MyDAS2 Division 3, Table 1, Item response on 20
at http://prod2.dev- 1 (10.4.3.1.1) - January 2022
assess.qld.gov.au/suite Contaminated land (Reference No. 2201-
/ (for assistance, (unexploded ordnance) 26787 SRA). A copy of
contact DILGP at 5352 (Planning Regulation the response is
9702 or 2017) attached
email:[email protected] )
6. ADVISORY NOTES
The following notes are included for guidance and information purposes only and do not form part
of the assessment manager conditions:
The following notes are included for guidance and information purposes only and do not form part
of the assessment manager conditions:
General Advisory Notes
1. Council has undertaken an audit check of the Operational Works drawings in relations to the
proposed works. A detailed check of the calculations and drawings has not been undertaken,
as they have been certified by a RPEQ. The RPEQ bears full responsibility for all aspects of
the engineering design. Council reserves the right to require further amendments and/or
additions at a later date should design errors become apparent.
Page 13 of 18
Document Set ID: 24329699
Version: 3, Version Date: 24/11/2025
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Minor Change Existing Approval MCU21/0228.02 & OPW21/0364.02 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 206 KB (small file)
- File type
No other editions are linked here.