PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 12 JULY 2016
84. To facilitate production of As Constructed drawings it is suggested that all design
drawings are submitted in the Asset Design and As Constructed (ADAC) digital
format. (Guidelines on the use of ADAC are available at www.adac.com.au).
85. A construction management plan/strategy shall be prepared by a suitably qualified
Registered Professional Engineer and submitted to Council in conjunction with any
application for Operational Works. The construction management plan shall ensure
no damage occurs to Council services and that any adverse impact on the local area
due to the construction works is within the acceptable limit and properly managed to
the satisfaction of Council.
86. A Traffic Management Plan for the each separate demolition and construction phase
of the development shall be submitted to and approved by Council at least 5 working
days prior to the commencement of any Demolition or Building works or at least 5
working days prior to the pre-start meeting for Operational Works. The Traffic
Management Plan shall include but not be limited to:
86.1. Mitigate any adverse impact and disturbance on the local residential area and
on the traffic in the local and main roads to acceptable limits
86.2. Mitigate dust disturbance caused by vehicles and machinery movements
86.3. Limit the routes for the heavy vehicles to the major road network and limit the
use of the local roads within residential area as access to the site
86.4. Indicate provision for on-site and off-site parking for the required workforce
86.5. Indicate the location of loading and unloading areas
86.6. Indicate the location of any “holding” areas for heavy vehicles
86.7. Operating hours.
Note - the Elm Street frontage of site shall not be used for access, parking or loading
and unloading during construction (and post construction) phase unless a specific
written permit obtained from the Department of Main Roads.
87. Any damage caused to any public utility during the course of construction shall be
repaired to Council’s standards and at no cost to Council.
88. Any alteration of any public utility or other facilities necessitated by the development
of the land or associated construction works external to the site shall be at no cost to
Council.
89. The transportation of all materials to and from the site shall be undertaken in a
manner such that no particle matter escapes onto a public road. All vehicles carrying
materials either to or from the site shall be covered to prevent materials including
dust being windblown from the vehicle.
90. As Constructed drawings and data shall be certified by a qualified experienced Civil
Engineer for design intent, and a Licensed Surveyor shall certify the cadastre and the
location, level and type of all services and structures. All of which shall be submitted
to Council for checking and for Council’s records.
The data must fully detail levels for all engineering works including but not limited to
roadworks, pathway, sewer main, water supply main, finished ground levels and
pavement surface levels and drainage structures that will become Council asset. The
data shall be submitted in the Asset Design and As Constructed (ADAC) digital
format. (Guidelines on the use of ADAC are available at www.adac.com.au).
Approval of works shall not be granted until all As Constructed information has been
supplied and accepted by Council.
Page 87 of 185
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.