PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 12 JULY 2016
Waste Management
91. A Waste Management Plan (construction and demolition) shall be submitted prior to
demolition, removal or relocation of any building other than a shed. Waste
Management Plan (construction and demolition) is also required for construction of
15 or more dwelling units or for any business use of greater than 500m².
Waste Management Plans (construction and demolition) are required to be submitted
in accordance with Planning Scheme Policy 11, Waste Management Plans see table
below. Waste storage areas are to provide for adequate separation of all reusable,
recyclable and waste materials. These shall be located so that they are convenient
and safe to use. The Plan shall contain the following information:
The site area for the storage and separation of waste is to be shown on the plan
drawings accompanying the application.
A waste management table as indicated below is to be completed showing how
waste material is to be segregated - recycled – reused or disposed.
MATERIALS ON-SITE DESTINATION
Re-use and Recycling Disposal
Expected waste Estimated On-site Off-site *specify
materials volume *specify proposed *specify contractor and
(m³) re-use or on-site contractor and landfill site or
recycling methods recycling outlet other disposal
site
Excavation material
Green waste
Bricks
Concrete
Timber-please
specify
Plasterboard
Metals - please
specify
Asbestos
Other - please
specify
Note * If a demolition contractor is undertaking works, then the Waste Management table is to
be completed by the demolition contractor.
The purpose of the Waste Management Plan is to facilitate the segregation of waste for the
effective reuse and recycling of such materials. Additionally, Council rewards those who
segregate waste by significantly reducing disposal fees at the landfill some items are free.
Higher gate fees are charged for loads of mixed waste.
Mosquito Protection
92. A Management Plan must be submitted for the control of mosquitos from the three
large water basins, including form of construction of basins, vegetation in and along
the shoreline, on-going monitoring and eradication treatments. Plan is to be
approved by Council’s Environmental Health Section.
Noise Management
93. The location and operational hours of mechanical plant equipment including domestic
air conditioning units, is not to create a noise nuisance to occupiers.
94. Noise from building works associated with residential development must comply with
the following–
94.1. Limited to between 7:00am to 6:30pm Monday to Saturday.
Page 88 of 185
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.