Skip to the record
Every meeting, every word.

Original source · versioned page text

2016-07-12 Planning & Environment Committee Agenda

of 185

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (25.3 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                  12 JULY 2016


          94.2. All reasonable measures are taken to minimise noise emissions.
          94.3. Not permitted on Sunday or public holidays.
    Waste Management
    95.   A Waste Management Plan (Operational) in accordance with Planning Scheme
          Policy No. 9 Waste Management must be submitted for the day-to-day operation of
          the development and approved by Council’s Waste and Health Section prior to issue
          of development permit for operational works.
          It is critical that waste areas are properly planned. A copy of Planning Scheme Policy
          No. 9 Waste Management explaining exactly how to predict waste quantities and
          design waste areas is available from Council and online. The Plan shall include the
          following information:
             The types of waste that will be generated from the activities approved within the
               development.
             Estimated volumes or tonnage of both recyclables and waste generated.
             Methods to be used for dealing with garden waste.
             Initiatives to minimize waste either by waste prevention, reduction, re-use or
               recycling.
             Description of procedures for getting all waste to the bins; the storage of bins
               and the collection of bins by the contractor.
             A description of the design details of waste storage and recycling areas
               including size, location, elevation and floor plan, methods of bin washing and
               system to prevent storm water getting into sewer via the bin wash.
             A description of types and volume of waste storage containers to be used.
             The waste and recycling storage areas shall include the provision of containers
               for all waste and recycling materials including putrescible matter, non-recycling
               waste, paper/cardboard, glass, aluminium/steel cans, waste oil, styrofoam
               boxes, etc, and bin washing facilities connected to sewer at each storage area.
             A detailed description of vehicular access to collect waste. Where collection is
               off street, access must allow vehicles to enter and leave the site in a forward
               direction.
    96.   The waste storage area for independent living units and clubhouse must:
          96.1. Be located with direct access off Trading Post Road.
          96.2. Have a turning area suitable for a 12.5m length HRV.
          96.3. Be completed in time to accommodate the occupation of any stage 1A units.
          96.4. Be provided with additional waste and recycling receptacles as further stages
                are completed.
    97.   The waste storage area for the aged care facility must be located directly adjacent to
          the loading bay driveway.
B   Approve the Reconfiguring a Lot application (REC15/0031) in accordance with the
    following conditions
    Reconfiguring a Lot Conditions for 4 Lots into 3 – REC15/0031
    When Conditions Must Be Complied With
    1.    Unless otherwise stated, all works required by these conditions must be completed
          prior to submission of the subdivision plan to Council for compliance assessment.

                                                                                Page 89 of 185
Log in to download the original file

2016-07-12 Planning & Environment Committee Agenda(PDF, 24MB).pdf · 25.3 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.