Skip to the record
The gold standard in government transparency.

Original source · versioned page text

Town Planning Report

Attached to the e-mail MCU16/0066 & OPW16/0133 - Report, IDAS Forms & plans (1 of 4).

of 29

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Project Urban – 16161                                                                      June 2016



7.7.3.2 Earthworks Code
Covey Associates have considered the likely earthworks requirements of the proposal and do not
consider the earthworks that are required to be significant.

7.7.3.3 Erosion and Sediment Control Code
Standard erosion and sediment control measures will be incorporated into the construction stage
of the development. These measures will be detailed in a future operational works application.

7.7.3.4 Existing Services Code
The existing sewer in the south-west corner of the site will be protected. The Engineering
Services Report prepared by Covey Associates confirms that the proposal is generally compliant
with the relevant provisions of the Existing Services Code.

7.7.3.5 Transport, Roads and Drainage Code
The Traffic Engineering Report confirms that the proposal is generally compliant with the
transport and road requirements of this code. The Stormwater Management Plan prepared by
Covey Associates addresses the drainage requirements of this code.

7.7.3.6 Waste Management Code
Appropriate waste storage and collection areas are provided in the service area shown on the
architectural plans. The Traffic Engineering Report confirms that these storage areas can be
adequately serviced by the relevant waste collection vehicle.

7.7.3.7 Water Sensitive Design Code
The Stormwater Management Plan demonstrates compliance with the Water Sensitive Design
Code.

7.7.3.8 Water Supply and Sewerage Reticulation Code
The Engineering Services Report confirms that the proposal is generally compliant with the
relevant provisions of the Water Supply and Sewerage Reticulation Code.

7.7.4 Advertising Devices Code
The total combined sign face areas of all signs and pylon signs do exceed the preferred sign face
areas of the code. The subject site is located in an industrial estate and on a prominent site. The
Bruce Highway is a motorway that carries significant traffic in and out of the region. The proposed
signage is considered to be reasonable given the site’s zoning and location and taking into
account the reasonable commercial and promotional needs of the uses.




Development Assessment Report                                                           Page 25 of 29
Material Change of Use and Operational Work
6 Taylor Court, Cooroy
Log in to download the original file

Town Planning Report.pdf · 932 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.