M2358
Page 30 of 43
March, 2010
Column 1 Column 2 Column 3
Specific Outcomes Probable solutions (if code assessable) Applicant Comment
the amenity of the local area) in the short and long term; c) no extensions to the existing reticulation network is
and necessary; or
f) ensures that the existing systems are upgraded or d) it is necessary to cross a body of water; AND
relocated to be capable of supporting the proposed e)
development;
S17.3 Street lighting is provided in accordance with Section 3.19
of PSP5 Engineering Design Standards – Roads, Drainage and
Earthworks; AND
S17.4 For lots not within a sewerage service area—the lot has
sufficient area and other attributes to ensure sustainable on-site
sewerage disposal;
Advisory note
PSP24 – Effluent Disposal details requirements for the
design and siting of effluent disposal systems where located
outside a sewerage service area. Compliance with PSP24
O18 Essential public utilities are available and maintain their will be considered as part of Council‘s assessment of the
function during flood events up to a 1% AEP (1:100 year ARI) plumbing and drainage application.
flood event.
S18.1 Components of the infrastructure that are likely to fail or may C18 The site is currently serviced by appropriate infrastructure
result in contamination are— which accords with the Council‘s requirements.
a) located above the level of a 1% AEP (1:100 year ARI) flood
event; or
b) designed and constructed to exclude water inundation or
infiltration and resist hydrostatic and hydrodynamic forces
as a result of inundation.
Electricity supply infrastructure S19.1 Building footprints are situated clear of any power C19 As above.
O19 Uses and works maintain a safe distance from electrical easements on-site;
infrastructure including substations, overhead power lines, power AND
poles and transformers.
S19.2 Building footprints are not less than 50m from an existing
fenced electricity substation.
14.198 Earthworks and stormwater management
O20 Stormwater run-off is managed so as not to cause any No solution provided C20 Stormwater will be treated in accordance with the
adverse impacts on the built or natural environment including Stormwater Management Plan approved as part of the Material
changes in quality, quantity or location of stormwater discharges. Change of Use (Council Reference: DA2007/1259).
O21 Filling or excavation only occurs where it does not No prescribed solution. C21 Filling of the site will occur in accordance with Development
adversely impact on— Approval (Council Reference: DA2007/1259).
a) watercourses, drainage lines and wetlands; or
b) vegetation on land identified on Biodiversity Overlay
Maps OM1.1-OM9.1; or
c) water levels on properties elsewhere.
Please consider the environment before re-printing this Development Application.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
10/0627 M2358 Planning Report.pdf [As Published]Related documentApplication case desk ↗
About this file
- File size
- 15.7 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.