Original source · versioned page text
19660 OPW26-0033 - response to info request
Issue 7 – Drainage Easements The submitted engineering plans does not detail the inter-allotment drainage easements pursuant to conditions 12 and 16 of the Higher Order Approval (RAL19/0014) – notwithstanding the future lot numbers have changed. Information Required 7. Provide amended plans that details the extent of the inter-allotment drainage easement pursuant to conditions 12 and 16 of the Higher Order Approval (RAL19/0014). Response Inter-allotment easements are shown on drawings 19660 – C200 & C201. Additional notes and dimensions have been added as requested. Issue 8 & 9 – Stormwater Management Insufficient information has been provided to demonstrate compliance with conditions 37 and 38 of the Higher Order Approval (RAL19/0014). Additionally, proposed structures “6/A”, “7/A” and “8/A” are surcharge pits – which contradicts condition 37(c) of the Higher Order Approval. Information Required 8. Provide a Stormwater Management Plan that satisfies the requirements of conditions 37 and 38 of the Higher Order Approval (RAL19/0014). The SWMP must be prepared by a suitably qualified person (RPEQ). 9. Provide amended plans that includes gravity stormwater drainage structures in lieu of surcharging pits. Page 4 of 9 Tod Job Number: 19660-OPW2-A
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (19660 OPW26-0033 - response to info request.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.