SUPERSEDED Decision Notice - Approved by Delegation of Authority - DBW25 0051 & OPW25 0054 (As Published) · OPW25/0054
DEVELOPMENT PERMIT FOR OPERATIONAL WORKS – VEHICLE CROSSOVERS
(OPW25/0054)
Approved Plans
1. Development undertaken in accordance with this approval must generally comply with the
approved plans of development. The approved plans are listed in the following table unless
otherwise amended by these conditions.
Plan No. Rev. Plan/Document Name Date
4868 Sheet 2/14 A Site Plan Proposed prepared by Reitsma 19 May 2025
(Annotated by Council)
Currency Period
2. The Currency Period for this development approval lapses if the development has not
substantially started by 3 July 2027, unless an application to extend the currency period is
approved by Council.
Site Specific Conditions
3. The driveway in the Landrail Street frontage must be setback a minimum of 6 metres from
the end of the existing kerb at the intersection of Landrail Street with Oriole Avenue.
4. The works must include kerb and channel in Landrail Street extending between the proposed
driveway and the existing kerb and channel at the intersection with Oriole Avenue.
5. A site control and/or compliance bond of $2000 is to be submitted to Council prior to the pre-
start meeting. The pre-start meeting will only be held once Council's Construction
Engineering Officer has confirmation that the bond monies have been received by Council.
The bond will be refunded less any costs incurred by Council in ensuring compliance with
these conditions or any additional inspections incurred for substandard work or work
undertaken not in accordance with this permit.
PRIOR TO COMMENCEMENT OF WORKS
Engineering
6. All necessary approvals from external service providers (eg Unitywater) and external parties
on which the development works are proposed have been obtained and a copy supplied to
Council.
7. A condition report including photographs of the frontages of the site to Landrail Street and
Oriole Avenue must be completed and submitted to Council at the prestart meeting / prior to
any works commencing.
8. Certificates demonstrating currency of public liability insurance and works insurance covering
the works must be submitted to Council prior to the prestart meeting.
9. Council must be contacted at least 5 working days prior to any works commencing to
organise a prestart. The contact number to arrange a pre-start meeting is 5329 6500. The
pre-start meeting must include the relevant parties for the following aspects of the works:
a. Civil engineering works;
b. Erosion and sediment control works;
c. Other relevant parties
Page 5 of 12
Document Set ID: 23877592
Version: 5, Version Date: 10/07/2025
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
SUPERSEDED Decision Notice - Approved by Delegation of Authority - DBW25 0051 & OPW25 0054 (As Published)Related documentApplication case desk ↗
SUPERSEDED Decision Notice - Approved by Delegation of Authority - DBW25 0051 & OPW25 0054 (As Published).pdfRelated documentApplication case desk ↗
About this file
- File size
- 196 KB (small file)
- File type
No other editions are linked here.