Decision Notice plus copy sent to Referral Agencies [As Published] · 132007.2398
2007/2398
A duly executed copy of the easement shall be submitted to Council for perusal prior to the
use commencing.
Power Supply
85. An underground electricity service shall be provided to the site if not already provided.
In this regard, an approved ENERGEX Electrical Design Consultant shall work in conjunction
with Council’s Manager - Works Support to prepare detailed designs of the electrical proposal.
The detailed deigns shall then be submitted to ENERGEX for approval and a copy of their
approval submitted to Council in conjunction with a “Certificate of Electricity Supply for
Proposed Subdivisions” (prepared by an approved ENERGEX Electrical Design Consultant)
prior to Council endorsing the Plan of Survey.
Any agreement with ENERGEX or an approved ENERGEX Electrical Design Consultant shall
be wholly at the applicant’s expense and shall not entail a financial encumbrance on future
purchasers of the proposed lots.
86. The requirements of ENERGEX shall be satisfied in relation to any existing services traverse
the site. Written confirmation by ENERGEX that satisfactory arrangements have been made to
formalise any required easements and/or existing informal services shall be submitted prior to
Council endorsing the Plan of Survey.
87. Streets lighting and pathways lighting throughout the development site must be provided in
accordance with Australian Standards.
88. Street lighting shall be provided along Pearsons Road frontage of the site in accordance with
Australian standards.
Telecommunication
89. The requirements for TELECOMMUNICATION services shall be satisfied in relation to the
provision of new telephone services to the developed site. In this regard written confirmation
from an approved telecommunication agency shall be submitted to the Council prior to Council
endorsing the Plan of Survey.
Erosion and Sediment Control
90. Any person acting on this permit shall prevent erosion and sediment export from leaving the
site. Site control measures such as silt fencing, controlled gravel access to the site and
controlled disposal of waste, will be necessary.
In this regard plans detailing the methods of controlling erosion and sediment are required to
be submitted to the Council for approval prior to obtaining a Development Permit for
Operational Works.
Contributions Towards Council Infrastructure
91. Monetary contributions shall be paid to Sunshine Coast Regional Council towards the cost of
providing and/or upgrading various infrastructure at the rates applicable at the time of payment.
An estimate only of the contribution amounts under the current Council policies and
requirements is outlined in the table below:
Page 11 of 32
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Decision Notice plus copy sent to Referral Agencies [As Published]Related documentApplication case desk ↗
About this file
- File size
- 644 KB (small file)
- File type
No other editions are linked here.