Decision Notice plus copy sent to Referral Agencies [As Published] · 132007.2398
2007/2398
Rebate for
Eligible
INFRASTRUCTURE NETWORK
Community
Total Organisation Total
Contribution Amount
Stage PSP 12 PSP 16 PSP 17 PSP 20 Rural / Charitable Payable
Applicable to
Public Rural Water Pathway Local Development non-profit for $
Open Sewerage Headworks Trunk Roadworks community
Space Headworks Network services
(Park) facilities
Stage 1 $105,504 $202,017 $197,531 $49,374 $17,848 $572,274 100% $0
Stage 2 $22,936 $65,655 $59,003 $10,495 $7,349 $165,438 100% $0
Stage 3 $31,673 $90,667 $81,480 $14,492 $10,149 $228,461 100% $0
Stage 4 $14,198 $40,644 $36,525 $6,497 $4,549 $102,413 100% $0
Stage 5 $22,936 $65,655 $59,003 $10,495 $7,349 $165,438 100% $0
Stage 6 $26,212 $75,035 $67,432 $11,994 $8,399 $189,072 100% $0
Stage 7 $19,659 $56,276 $50,574 $8,995 $6,299 $141,803 100% $0
Stage 8 $21,844 $62,529 $56,193 $9,995 $6,999 $157,560 100% $0
Stage 9 $13,106 $37,517 $33,716 $5,997 $4,200 $94,536 100% $0
Total = $278,068 $695,995 $641,457 $128,334 $73,141 $1,816,995 100% $0
Please note that these amounts are all subject to variations in the Consumer Price Index, All
Groups Brisbane from December 2009 until the date of payment. All contributions must be paid
prior to commencement of use.
General
92. A suitably qualified Registered Professional Engineer shall prepare engineering drawings and
specifications for all engineering works that will become Council infrastructure, which shall be
submitted in conjunction with an application for a Development Permit for Operational Works.
In this regard a DXF/DWG file on GDA94 zone 56 grid of the proposed cadastre layout is to be
submitted in conjunction with any application for Operational Works.
93. Digital detailed designs including drawings, calculations, specifications and a schedule of
works, shall be submitted with any application for a Development Permit for Operational Works
in respect of roadworks and stormwater drainage works. The design shall be in accordance
with Council’s Planning Scheme Policy PSP05 – Engineering Design Standards – Roads,
Drainage and Earthworks. To avoid conflict with underground pipes or services, all existing
and proposed services required by the development shall be shown on the plans.
94. To facilitate production of As Constructed drawings it is suggested that all design drawings are
submitted in the Asset Design and As Constructed (ADAC) digital format. (Guidelines on the
use of ADAC are available at www.adac.com.au).
95. A construction management plan/strategy shall be prepared by a suitably qualified Registered
Professional Engineer and submitted to Council in conjunction with any application for
Operational Works. The construction management plan shall ensure no damage occurs to
Council services and that any adverse impact on the local area due to the construction works
is within the acceptable limit and properly managed to the satisfaction of Council.
96. A Traffic Management Plan for the each separate demolition and construction phase of the
development shall be submitted to and approved by Council at least 5 working days prior to
the commencement of any Demolition or Building works or at least 5 working days prior to the
pre-start meeting for Operational Works. The Traffic Management Plan shall include but not
be limited to:
96.1 Mitigate any adverse impact and disturbance on the local residential area and on the
traffic in the local and main roads to acceptable limits;
Page 12 of 32
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Decision Notice plus copy sent to Referral Agencies [As Published]Related documentApplication case desk ↗
About this file
- File size
- 644 KB (small file)
- File type
No other editions are linked here.