2015-07-21 Planning & Organisation Committee Agenda
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
PLANNING & ORGANISATION COMMITTEE MEETING AGENDA 21 JULY 2015
A new map showing updated Koala Habitat is to be included as Schedule 7, showing the general
extent of known and potential habitat to support the provisions of the Biodiversity Overlay Code.
e) Bushfire Mapping
New bushfire mapping has been prepared by the State and reflects a more rigorous methodology
than in the past. Staff have been working with the State to help verify its accuracy and ensure its
suitability for the planning scheme. The mapping is proposed to replace the existing bushfire
hazard mapping in the Natural Resources Overlay.
Some minor amendments have also been made to the Natural Hazards Overlay Code for
bushfire to align with the new mapping terminology.
f) Priority Infrastructure Plan & Charges
The State has requested removal of water supply and sewerage provisions (i.e. standards of
service, plans for trunk infrastructure) and mapping from the Priority Infrastructure Plan (PIP) and
for these details to be replaced by references to the Unitywater Water Netserv Plan.
Staff agree that these changes should be completed now to reflect the current water and
sewerage arrangements as this would be helpful in avoiding any potential conflict between the
PIP and the Unitywater Water Netserv Plan.
In addition the Minister opposed proposed amendments in use codes that requested new
infrastructure be delivered “at no cost to Council” and this phrase has therefore been deleted.
3. Procedural Requirements
The process for making or amending a planning scheme is set out in Statutory Guideline 04/14.
Having now completed the Planning and Preparation and the State interest Review the next step
in this process is Public Consultation. This step, including mandatory timeframes can be
summarised with the following figure.
Minister reviews the
information and
Council considers each Council provides decides whether or not
Council carries out
properly made proposed Council may proceed to
public consultation
submission and decides Amended planning adopt the proposed
about the proposed
whether or not to make scheme (with Planning scheme
amendments and the
changes to the or without changes) amendments (with
community provide
proposed amendments and supporting or without conditions)
submissions
in response to information to the or undertake other
(min 30 business days)
submissions. Minister actions that may be
required
(max 40 business days)
4. Communications Plan
In accordance with Council’s policy a Community Engagement Project Plan has been prepared,
that should ensure not only the statutory obligations are met, but that any affected or interested
persons have the chance to make informed comments on the proposed amendments. This plan
is provided as Attachment 2.
Page 88 of 140
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.