Skip to the record
Every meeting, every word.

Original source · versioned page text

2015-07-21 Planning & Organisation Committee Agenda

of 140

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

Page 98 of 140

and enhance the        likely to fail or may result in contamination when inundated by
            community's resilience | flood water® to:
            to natural hazards
                                   “Components of the essential network infrastructure that are
                                   likely to fail or may result in contamination when affected by
                                   flood water,”
                                   Reason: To align with DSDIPs interest in protecting essential
                                   infrastructure during and after a natural hazard event. The
                                   proposed amendment to this provision broadens the capacity to
                                   protect this infrastructure to include scenarios whereby flooding,
                                   along with direct inundation, may indirectly affect the affect the
                                   essential network infrastructure.
            The risks associated   Planning Scheme Reference: Part 2, 2.6 Determining             Change done as requested
            with natural hazards   assessment under the planning scheme, 2.6.9 SPP interim DA
            are avoided or         requirements
            mitigated to protect
            people and property    Action: |f council intend on listing interim DA requirements, all
            and enhance the        interests should be added. The Noosa Plan has not been
            community's resilience | signed off by the Minister as reflecting any part of the SPP July
            to natural hazards     2014.
                                   Add;
                                   .       Natural hazards, risk and resilience
                                   Reason: Under the SPP, all of the interim DA requirements
                                   apply to the Noosa Plan. The interests should be listed as they
                                    appear in the SPP.

 Table 5—Planning for infrastructure
 Energy and water supply
Re                                                                                                     cae a come
 6 (a)      Pianning supports the | Planning Scheme Reference: Part 13 - Division 8 & 10 — Natural     The bulk water facility at Lake Macdonald and the pipeline
            timely, safe affordable | resources overlay code and associated overlay maps               south has been added to the Natural Resource Overlay

                                                                                                                                                        Page 98 of 140
Log in to download the original file

2015-07-21 Planning & Organisation Committee Agenda(PDF, 5MB).pdf · 5.5 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.