Skip to the record
The definitive source for everything Noosa Council.

Original source · versioned page text

2015-07-21 Planning & Organisation Committee Agenda

of 140

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

Page 99 of 140

and reliable provision                                                                     map.
and operation of        Action: The planning scheme should be amended to protect bulk
electricity and water   water supply infrastructure in accordance with the SPP.            Within the Natural resources Overlay Code a new overall
supply infrastructure                                                                      outcome has been added as follows:
                          ¢  Amend the natural resource overlay maps to show bulk water | d)       for areas in proximity to existing and future bulk
                             infrastructure as shown in the SPP interactive mapping.       water ae infrastructure and corridors (including
                                                                                           easements):
                                                                                                  i.       development does not compromise the
                          ¢  Amend the overall outcomes of the natural rpeources overlay               idor integrity, and the efficient delivery and
                             code 13.42.2 (d) to include a new outcome as follows:                functioning > pal identified infrastructure; and
                          for arees in proximty to existing and future bulk water supply|          ——neroachnot by sonatve land use ators
                          infrastructure and corridors (including easements):                      practicable
                          i. development does not compromise the corridor integrity, and                     ,
                             the  efficient delivery and   functioning of  the   identified
                             infrastructure; and
                          ii. bulk water infrastructure is protected from encroachment by
                             sensitive land uses where practicable
                         Reason: The SPP requires that bulk water supply infrastructure is
                         protected from incompatible development, The Noosa Shire Council
                        area includes the following bulk water supply Infrastructure:
                            *   Six Mile Creek Dam — Lake MacDonald
                            e   Noosa Water Treatment Plant
                            e   Northern Pipeline Interconnector
                            ©   Mary Valley Pipeline
                            *   Cooroora Reservoir.

                                                                                                                                            Page 99 of 140
Log in to download the original file

2015-07-21 Planning & Organisation Committee Agenda(PDF, 5MB).pdf · 5.5 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.