Skip to the record
The first. The best. The only NoosaWatch™.

Original source · versioned page text

24110095-TGS 25-SA_TT-JHG-Lake Macdonald Dr_Lake Macdonald-R0

of 20

Page text shows just the words. Original shows the document exactly as it was published.

                                      Potential Risk                                                       Initial Risk                          Control Measures                                   Revised Risk                              Actions
        Source                              Event                      Risk Evaluation       Likelihood   Consequence     Rating                       Options                         Likelihood   Consequence    Rating        Who                     What
Traffic Impacts - Cont.

                            Volume of detoured traffic has                                                                         1. Traffic shall be detoured along the same if                                           1. John    1. Ensure enough Staff to preform
                            unacceptable impact on surrounding                                                                     not higher category road                                                                 Holland    duties and regular inspection are made
                            areas including                                                                                        If Work
                                                                                                                                   2.       site conditions
                                                                                                                                      Separate               change
                                                                                                                                                  detour routes  may and  this
                                                                                                                                                                      be utilised                                           Group      1.  Monitor
                                                                                                                                                                                                                                       ensure  that work
                                                                                                                                                                                                                                                    is safesite conditions
                                                                                                                                                                                                                                                             Notice  to be provide
                                                                                                                                   Source / Event becomes a concern a Site                                                             2  . Contact details supplied
                                                                                                                                                                                                                                       residents.
Detouring of traffic         - property and business access is                                                                     for MO & MA vehicles
                                                                       Present
                                                                      Not       at at
                                                                          present  this
                                                                                      this                                         Specific Risk Assessment shall be                                                                   3.  Report that
                                                                                                                                                                                                                                       2. Ensure   anyTchanges      to to
                                                                                                                                                                                                                                                         GS is drafted
from a major or             compromised                                                      Moderate
                                                                                               Rare          Major
                                                                                                             Minor        High
                                                                                                                          Low      3. Ensure local access are allowed when               Rare          Major        Low     2. T MD
                                                                           location
                                                                           location                                                undertaken and if the situation is unable to                                                        conditions
                                                                                                                                                                                                                                       accommodate  to PC
                                                                                                                                                                                                                                                        VRUorwith
                                                                                                                                                                                                                                                                Supervisor
                                                                                                                                                                                                                                                                   s safe detour.
multi-lane road              - Increased volume of traffic on                                                                      practical.
                                                                                                                                   be addressed Contact Supervisors and/or                                                             3. Report
                                                                                                                                                                                                                                       4   Ensure any
                                                                                                                                                                                                                                                  that Signs
                                                                                                                                                                                                                                                        changesandto
                                                                                                                                                                                                                                                                   Devices   are
                                                                                                                                                                                                                                                                       the Team
                            residential streets leading to                                                                         4. If practical,
                                                                                                                                   T MD             work
                                                                                                                                          for further     outside of peak hours.
                                                                                                                                                      actions                                                               3. T MI    installed as per the T GS.
                                                                                                                                                                                                                                       leader
                            compromised safety outcomes for                                                                        5. Notice to locals e.g. Letterbox drops                                                            Regular safety checks of detour route.
                            residents                                                                                                                                                                                       4. T C     4. Ensure that they are stationed in a


                                                                                                                                                                                                                            1. John    1. Ensure enough Staff to preform
                                                                                                                                   1. Traffic shall be detoured along the same if                                           Holland    duties and regular inspection are made
                                                                                                                                   If Work
                                                                                                                                   not      sitecategory
                                                                                                                                       higher    conditions  change and this
                                                                                                                                                          road                                                              Group      of the
                                                                                                                                                                                                                                       1.     route work
                                                                                                                                                                                                                                           Monitor  to ensure  that is is Hazard
                                                                                                                                                                                                                                                          site conditions
                                                                                                                                   Source   / Event  becomes                                                                           free.
Detouring of traffic                                                                                                               2. Separate   detour  routes amay
                                                                                                                                                                  concern   a Site
                                                                                                                                                                      be utilised                                                      2  . Contact details supplied
                            Detoured traffic experiences               Present
                                                                      Not       at at
                                                                          present  this
                                                                                      this                                         Specific  Risk  Assessment    shall be                                                              Client
                                                                                                                                                                                                                                       3.     to provide
                                                                                                                                                                                                                                           Report         notice toto
                                                                                                                                                                                                                                                   any changes      local
from a major or                                                                              Moderate
                                                                                              Rare           Major
                                                                                                             Minor        High
                                                                                                                          Low      for MO & MA vehicles                                  Rare          Major        Low     2. T MD
                            unacceptable delays                            location                                                undertaken and if the situation is unable to                                                        residents. to PC or Supervisor
                                                                                                                                                                                                                                       conditions
multi-lane road                                                                                                                    3. Detours only to be implemented outside                                                           2. Report
                                                                                                                                                                                                                                           Ensure any
                                                                                                                                                                                                                                                  that Tchanges
                                                                                                                                                                                                                                                         GS is drafted
                                                                                                                                   be addressed Contact Supervisors and/or                                                             4                          to thetoTeam
                                                                                                                                   of peak hour traffic for closed road and                                                 3. T MI    accommodate VRU. Ensure a safe
                                                                                                                                   T MD for further actions                                                                            leader
                                                                                                                                   roads on detour route.                                                                              detour has been drafted.
                                                                                                                                                                                                                            4. T C     3. Ensure that Signs and Devices are


                                                                                                                                                                                                                            1. John    1. Ensure enough Staff to preform
                                                                                                                                   1. Ensure minimum lane requirements are                                                  Holland    duties and that regular inspection are
                                                                                                                                   If Work
                                                                                                                                   met      siteQld.
                                                                                                                                         as per conditions  change and this
                                                                                                                                                     Standards                                                              Group      1.
                                                                                                                                                                                                                                       madeMonitor
                                                                                                                                                                                                                                              of thework
                                                                                                                                                                                                                                                      routesite  conditions
                                                                                                                                                                                                                                                            to ensure   that is is
Works activities                                                                                                                   Source   / Event  becomes   a concern a Site                                                        Hazard
                                                                                                                                                                                                                                       2        free. details
                                                                                                                                                                                                                                          . Contact    Client tosupplied
                                                                                                                                                                                                                                                                 provide notice to
                                                                                                                                   2. Undertake   works  outside of peak hour
impacting on                Aggressive driver behaviour and lack       Present
                                                                      Not       at at
                                                                          present  this
                                                                                      this                                         Specific Risk Assessment shall be                                                                   local
                                                                                                                                                                                                                                       3.    residents.
                                                                                                                                                                                                                                           Report  any changes to
                                                                                             Moderate
                                                                                              Rare           Major
                                                                                                             Minor        High
                                                                                                                          Low      traffic                                               Rare          Major        Low     2. T MD
existing or temporary       of community acceptance of worksite            location                                                undertaken and if the situation is unable to                                                        2. Ensure that
                                                                                                                                                                                                                                       conditions       T GSorisSupervisor
                                                                                                                                                                                                                                                    to PC        drafted to
                                                                                                                                   3. Notice to locals e.g. Letterbox drops                                                            accommodate      VRU. Ensure     a safe
path routes                                                                                                                        be addressed Contact Supervisors and/or                                                             4  Report any changes        to the Team
                                                                                                                                   4. Refer to local road authority and site                                                3. T MI    detour has been drafted.
                                                                                                                                   T MD for further actions                                                                            leader
                                                                                                                                   supervisor                                                                                          3. Ensure that Signs and Devices are
                                                                                                                                                                                                                            4. T C     installed as per the T GS.


                                                                                                                                                                                                                            1. John    1. Ensure they have ordered enough
                                                                                                                                   1. Ensure minimum lane requirements are                                                             Staff to be onsite to preform duties
                                                                                                                                                                                                                            Holland
                                                                                                                                   met   as per
                                                                                                                                   If Work   siteQld    Standards
                                                                                                                                                    conditions  change and this                                                        1.  Monitorthat
                                                                                                                                                                                                                                       2. Ensure    work  site
                                                                                                                                                                                                                                                       T GS  is conditions
                                                                                                                                                                                                                                                                drafted to
Works impact on                                                                                                                                                                                                             Group
                                                                                                                                   2. Undertake
                                                                                                                                   Source     / Event works  outside
                                                                                                                                                         becomes      of peak hour
                                                                                                                                                                   a concern  a Site                                                   2  . Contact details
                                                                                                                                                                                                                                       accommodate     VRU supplied
existing crossings          Traffic volumes not suitably
                                                                Present
                                                               Not       at at
                                                                   present  this
                                                                               this                                                traffic
                                                                                                                                   Specific Risk Assessment shall be                                                                   3. Ensure
                                                                                                                                                                                                                                           Report that
                                                                                                                                                                                                                                                   anySigns
                                                                                                                                                                                                                                                        changes    to
                                                                                                                                                                                                                                                              and Devices   are
resulting in VRU            accommodated leading to Congestion                               Moderate
                                                                                               Rare          Major
                                                                                                             Minor        High
                                                                                                                          Low                                                            Rare          Major        Low     2. T MD
                                                                    location
                                                                    location                                                       undertaken
                                                                                                                                   3. Reduce length and ifof
                                                                                                                                                           the situation
                                                                                                                                                             work  area is unable to                                                   conditions
                                                                                                                                                                                                                                       installed as to
                                                                                                                                                                                                                                                    perPC
                                                                                                                                                                                                                                                        theor  Supervisor
                                                                                                                                                                                                                                                            T GS
unable to use the           / delays exceeds allowable levels                                                                      beNotice
                                                                                                                                       addressed       Contact  Supervisors  and/or                                                    4. Report
                                                                                                                                                                                                                                       4   Ensure any
                                                                                                                                                                                                                                                  that they are stationed
                                                                                                                                                                                                                                                       changes             in a
                                                                                                                                                                                                                                                                  to the Team
                                                                                                                                   4.            to locals e.g. Letterbox  drops
existing crossing route                                                                                                            T MD    for to
                                                                                                                                                further  actions                                                            3. T MI    position to guide or chaperone VRU
                                                                                                                                                                                                                                       leader
                                                                                                                                   5. Refer        site supervisor
                                                                                                                                                                                                                                       around the site safety
                                                                                                                                                                                                                            4. T C

                                                                                                                                                                                                                            1. John    1. Ensure they have ordered enough
                                                                                                                                   1. Ensure sight distances to signage is                                                  Holland    Staff to be onsite to preform duties
Works impact on                                                                                                                    If Work site as
                                                                                                                                   maintained     conditions change and this
                                                                                                                                                    per Qld Standards                                                       Group      1. Monitor work site conditions
                            Extended queue lengths, or road                                                                                                                                                                            2. Ensure that T GS is drafted to
existing crossings                                                                                                                 Source
                                                                                                                                   2. Install/ repeater
                                                                                                                                               Event becomes    a concern
                                                                                                                                                        signs where sight a Site                                                       2  . Contact details
                                                                                                                                                                                                                                       accommodate      VRU supplied
                            alignment factors affect sight distance    Present
                                                                      Not       at at
                                                                          present  this
                                                                                      this                                         Specific Risk   Assessment   shall be                                                               3.  Report that
                                                                                                                                                                                                                                                   anySigns
                                                                                                                                                                                                                                                         changes   to
resulting in VRU                                                                             Moderate
                                                                                              Rare           Major
                                                                                                             Minor        High
                                                                                                                          Low      distance    cannot be maintained                      Rara          Major        Low     2. T MD    3. Ensure               and Devices  are
                            to the end of queue, leads to network          location                                                undertaken and if the situation is unable to                                                        conditions
                                                                                                                                                                                                                                       installed as to
                                                                                                                                                                                                                                                    perPCtheor Supervisor
                                                                                                                                                                                                                                                             T GS
unable to use the                                                                                                                  3. Reduce or undertake work in stages as to
                            crash risks                                                                                            be addressed Contact Supervisors and/or                                                             4
                                                                                                                                                                                                                                       4. Report
                                                                                                                                                                                                                                            Ensureany
                                                                                                                                                                                                                                                   that changes   to the as
                                                                                                                                                                                                                                                        they positioned  Team
                                                                                                                                                                                                                                                                            per
existing crossing route                                                                                                            minimise length of queuing                                                               3. T MI
                                                                                                                                   T MD for further actions                                                                            leader
                                                                                                                                                                                                                                       the T GS and monitoring queues
                                                                                                                                                                                                                            4. T C


                                                                                                                                                                                                                            1. John    1. Ensure they have ordered enough
                                                                                                                                   1. Ensure sight distances to signage is                                                  Holland    Staff to be onsite to preform duties
Works impact on                                                                                                                    If Work site as
                                                                                                                                   maintained     conditions change and this
                                                                                                                                                    per Qld Standards                                                       Group      1. Monitor work site conditions
                            Volume of traffic in remaining lanes is                                                                                                                                                                    2. Ensure that T GS is drafted to
existing crossings                                                                                                                 Source
                                                                                                                                   2. Install/ repeater
                                                                                                                                               Event becomes    a concern
                                                                                                                                                        signs where sight a Site                                                       2 . Contact details supplied
                                                                                                                                                                                                                                       accommodate Cyclist
                            unacceptably high leading to traffic       Present
                                                                      Not       at at
                                                                          present  this
                                                                                      this                                         Specific Risk Assessment shall be                                                                   3. Report that
                                                                                                                                                                                                                                                   anySigns
                                                                                                                                                                                                                                                        changes    to
resulting in VRU                                                                             Moderate
                                                                                              Rare           Major
                                                                                                             Minor        High
                                                                                                                          Low      distance cannot be maintained                         Rare          Major        Low     2. T MD    3. Ensure              and Devices  are
                            queues extend through nearby                   location                                                undertaken and if the situation is unable to                                                        conditions
                                                                                                                                                                                                                                       installed as to
                                                                                                                                                                                                                                                    perPC
                                                                                                                                                                                                                                                        theor Supervisor
                                                                                                                                                                                                                                                            T GS
unable to use the                                                                                                                  3. Reduce or undertake work in stages as to
                            intersections / roundabouts                                                                            be addressed Contact Supervisors and/or                                                             4
                                                                                                                                                                                                                                       4. Report
                                                                                                                                                                                                                                          Ensure any   changes
                                                                                                                                                                                                                                                  that they       to the Team
                                                                                                                                                                                                                                                            are stationed in a
existing crossing route                                                                                                            minimise length of queuing                                                               3. T MI
                                                                                                                                   T MD for further actions                                                                            leader
                                                                                                                                                                                                                                       position to guide or instruct the Cyclist
                                                                                                                                                                                                                            4. T C

                                                                                                                                                                                                                            1. John
                                                                                                                                                                                                                            Holland    1. Provide traffic data for the site
                                                                                                                                   If Work
                                                                                                                                   1. Presetsite conditions
                                                                                                                                              minimum    QL change and
                                                                                                                                                            based on    this
                                                                                                                                                                      road                                                  Group      2.Review
                                                                                                                                                                                                                                       1.  Monitorestimated
                                                                                                                                                                                                                                                    work siteQL  and traffic data
                                                                                                                                                                                                                                                                conditions
Estimated Queue                                                                                                                    Source / Event becomes a concern a Site                                                             3. .Ensure
                                                                                                                                                                                                                                       2          that
                                                                                                                                                                                                                                            Contact    Signssupplied
                                                                                                                                                                                                                                                     details   and Devices are
                            Calculated Queue Length incapable to                                                                   classification
Length is impracticable                                           Present  at at
                                                                              this                                                 Specific  Risk1Assessment                                                                           installed asany
                                                                                                                                                                                                                                                    per changes
                                                                                                                                                                                                                                                         the T GS and
                                                                                                                                                                                                                                                                   to to
                            hold minimum of one to two vehicles  Not present     this        Moderate
                                                                                              Rare           Major
                                                                                                             Minor        High
                                                                                                                          Low      2. Category     streets EQL shall be is 30m
                                                                                                                                                               minimum                   Rare          Major        Low     2. T MD    3.  Report
due to insufficient room                                              location                                                     undertaken and if the situation is unable to                                                        monitor Queue
                                                                                                                                                                                                                                       conditions       Length
                                                                                                                                                                                                                                                    to PC   or Supervisor
                            expected for road classification                                                                       3. Category 2 streets EQL minimum is 50m                                                            4. Report
                                                                                                                                                                                                                                           To monitor
to hold potential traffic                                                                                                          be addressed Contact Supervisors and/or                                                             4          anyand   communicate
                                                                                                                                                                                                                                                       changes             the QL
                                                                                                                                                                                                                                                                  to the Team
                                                                                                                                   4. Category 3 streets EQL minimum is 100m                                                3. T MI    to T MI
                                                                                                                                   T MD for further actions                                                                            leader
                                                                                                                                                                                                                            4. T C


TGS TITLE:
                                 John Holland Group - Lake Macdonald Drive, Lake Macdonald - SA_TT - JHG-25LV-24110095-RA - Page 04                                                                                             Jay Persich TMD 1578 OPEN
Log in to download the original file

24110095-TGS 25-SA_TT-JHG-Lake Macdonald Dr_Lake Macdonald-R0.pdf · 1.7 MB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.