Attachment 4 - Building Certifier Advice & Flow Pressure Test Results.pdf
Australian Fire Services Testing # 11647.3 www.firetesting.com.au PH: 1800 347 383 Form 72—fire hydrant and sprinkler system periodic testing and maintenance Ves 1 ~ Juv 2014 This form is to be used for the purposes of commissioning water based fire safety installations, as required by the Queensland Development Code — Mandatory Part (MP) 6.1, which is a building assessment provision under the Building Act 1975, section 30. This form is also to be used in accordance with the ‘Fire hydrant and sprinkler system commissioning and periodic maintenance procedure’, defined in MP 6.1 as the ‘Relevant procedure’. Please note that this form does not comprise all maintenance requirements—this form is only for collecting results of for maintenance for some sections of the Australian Standards referred to and in each case, further testing is required. Part A—Test details Site name Noosa Reef Hotel Site address] 19 Noosa Drive - Noosa Client Cayas & Ward Maintenance test 6 monthly test Oo 12 monthly test | b= Syearlytest| O Testing Test Date: Thursday, 31 July 2025 Fire Hydrant details Fire Sprinkler Oo Time of test: 9:00am Combines O Part B—Hydrant hydrostatic test [| pass | O | —fat——P Oo Refer to the required pressure specification for either commissioning or periodic testing (as applicableyas per AS2419.1 Boost pressure kPa__| Testpressure kPa Durati mins | End of test pressure kPa | Loss (if any): | | \/min Part C—Hydrant test equipment/pressure gauges If using more devices, provide details in the Notes section below or complete another form. The correction factor must be kPa or a percentage. Flow measuring device | Orificepartc not required for orifice testing Mechanical Oo | Electromagnetic O Device 1 Gauge 1 Device 2 Gauge 2 Device 3 | Gauge 3 | Device 4 Gauge 4 Serial number AFSTO3 17786 AFSTO6 31373 AFST08 30974 AFSTO7 30964 Date calibrated 07/09/2024 06/02/2025 23/02/2025 11/02/2025 02/03/2025 | 22/11/2024 | 23/02/2025 09/09/2024 Correction certificate v v v v v v v v 65/100/150 mm face - 100mm - 100mm - 100mm - 100mm Digital reader v v v v v v v v Increments (kPa) l/s 1kPa /s 1kPa Is 1kPa /s 10kPa Part D—Hydrant system flow test PASS | Oo FAIL | This part relates to section 10.3 of AS2419.1 If pressure/flow rates do not meet the fire system design criteria and there are no on-site problems, contact the relevant water service provider to ascertain if there are any problems with the water system network. In the table below, please record the pressure readings obtained during the hydrant system flow test. Hydrant 1 DHPH located on the South-Eastern side | Hydrant 3 location of site location Hydrant2 | DHPH located on the North-Eastern side Hydrant 4 location of site location vecurements 20 /s@ 350 KES orecsure a x00 kPa Pumped | size/flow rate Hydrant 1 Hydrant 2 Hydrant 3 Hydrant 4 Total Flow Ssyerem 101/s 270 kPa - 10 I/s 101/s 220 kPa 220 kPa 20 I/s Mains Pressure System achieved: 20 I/s @ 220 kPa
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewSearchable page text hides email addresses. Original files are unchanged and may show email addresses.