Attachment 4 - Building Certifier Advice & Flow Pressure Test Results.pdf

of 5

Page text read automatically using OCR, there may be inaccuracies

Australian Fire Services Testing # 11647.3

www.firetesting.com.au PH: 1800 347 383

 

Form 72—fire hydrant and sprinkler system periodic testing and maintenance Ves 1 ~ Juv 2014

This form is to be used for the purposes of commissioning water based fire safety installations, as required by the Queensland Development Code
— Mandatory Part (MP) 6.1, which is a building assessment provision under the Building Act 1975, section 30. This form is also to be used in
accordance with the ‘Fire hydrant and sprinkler system commissioning and periodic maintenance procedure’, defined in MP 6.1 as the ‘Relevant
procedure’. Please note that this form does not comprise all maintenance requirements—this form is only for collecting results of

for maintenance for some sections of the Australian Standards referred to and in each case, further testing is required.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Part A—Test details
Site name Noosa Reef Hotel
Site address] 19 Noosa Drive - Noosa
Client Cayas & Ward
Maintenance test 6 monthly test Oo 12 monthly test | b= Syearlytest| O
Testing Test Date: Thursday, 31 July 2025 Fire Hydrant
details Fire Sprinkler Oo
Time of test: 9:00am Combines O
Part B—Hydrant hydrostatic test [| pass | O | —fat——P Oo
Refer to the required pressure specification for either commissioning or periodic testing (as applicableyas per AS2419.1
Boost pressure kPa__| Testpressure kPa
Durati mins | End of test pressure kPa | Loss (if any): | | \/min
Part C—Hydrant test equipment/pressure gauges
If using more devices, provide details in the Notes section below or complete another form. The correction factor must be kPa or a percentage.
Flow measuring device | Orificepartc not required for orifice testing Mechanical Oo | Electromagnetic O
Device 1 Gauge 1 Device 2 Gauge 2 Device 3 | Gauge 3 | Device 4 Gauge 4
Serial number AFSTO3 17786 AFSTO6 31373 AFST08 30974 AFSTO7 30964
Date calibrated 07/09/2024 06/02/2025 23/02/2025 11/02/2025 02/03/2025 | 22/11/2024 | 23/02/2025 09/09/2024
Correction certificate v v v v v v v v
65/100/150 mm face - 100mm - 100mm - 100mm - 100mm
Digital reader v v v v v v v v
Increments (kPa) l/s 1kPa /s 1kPa Is 1kPa /s 10kPa
Part D—Hydrant system flow test PASS | Oo FAIL |
This part relates to section 10.3 of AS2419.1 If pressure/flow rates do not meet the fire system design criteria and there are no on-site problems,
contact the relevant water service provider to ascertain if there are any problems with the water system network. In the table below,
please record the pressure readings obtained during the hydrant system flow test.
Hydrant 1 DHPH located on the South-Eastern side | Hydrant 3
location of site location
Hydrant2 | DHPH located on the North-Eastern side Hydrant 4
location of site location
vecurements 20 /s@ 350 KES orecsure a x00 kPa
Pumped | size/flow rate Hydrant 1 Hydrant 2 Hydrant 3 Hydrant 4 Total Flow
Ssyerem 101/s 270 kPa - 10 I/s
101/s 220 kPa 220 kPa 20 I/s
Mains
Pressure
System achieved: 20 I/s @ 220 kPa

 

 

 

 

 

 

 

 

Log in to download the original (Attachment 4 - Building Certifier Advice & Flow Pressure Test Results.pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.