Original source · versioned page text
Attachment 4 - Building Certifier Advice & Flow Pressure Test Results.pdf
Australian Fire Services Testing # 11647.3 www.firetesting.com.au PH: 1800 347 383 Part E—Pump appliance booster test | PASS | O | FAIL ja This part relates to sections 10.4 and 10.5 of AS2419.1 If pressure/flow rates do not meet the fire system design criteria and there are contact the relevant water service provider to ascertain if there are any problems with the water system network. In the tal n-site problems, low, please record the pressure readings obtained during the pump appliance booster test. Hrdant locations | ee en | ae | m System requirements | I/s @ | kPa Static pressure at booster kPa Pump inlet pressure kPa Booster supply pressure kPa Boost pressure kPa Calculated frictional loss kPa Part F—Spripkter hydrostatic test pass | CO | FAIL oO Sa Part G—Sprinkler system flow test PASS | O | FAIL x Sprinkler Requirements 905l/m@185kPa Sprinkler Achieved 810I/m@40kPa Part H—Compliance Critical defects Yes | C1 | Give owner/occupier a critical defect notice identified No 0 | Noaction required in relation to critical defects at this time Repairs/corrective Yes | O | Attach details (including action and date taken) as part of Licensee's report actions taken No No action required in relation to repairs/corrective actions at this ime Refer below System Pass| 0) | Submit Form 72 to Owner / Occupier Fail | Xl | Submit Form 72 to Owner / Occupier Part I—Signature By signing this Form 72, | confirm that the information contained herein is correct to the best of my knowledge given the information available and that this Form 72 has been completed in accordance with the relevant standards, codes and regulations. Licensee Bruce Dan Licence no. (BSA/PIC) Licensee SLIIH) Name M.App.Sc — Fire & Risk Engineering Signature ee 739305 For and on behalf of AFST Pty Ltd Comments 1. Part D unassisted flow & pressure test fails. 2. Block Plan is defective and needs to be redrawn and replaced — refer page 3 3. One Double head Hydrant is obscured by a tree fern — refer page 4 4. Automatic fire sprinkler system flow and pressure test performed at the alarm valve fails — refer page 4 5. SeeAFST report 11647.3 Report of street mains testing results Note: Building owners/occupiers are responsible for ensuring their buildings continuously meet fire safety standards. Where a building owner/occupier becomes aware that their building does not meet the minimum requirements for water pressure required by any standard applicable under the Queensland Development Code Mandatory Part 6.1 (Maintenance of fire safety installations) the building owner/occupier should contact the Queensland Fire and Emergency Service. Definitions “Commissioning test” is a test that is required upon completion of a new system or an extension to an existing system. “Running test” means a two inch waste test installed at the sprinkler control valve on older systems Privacy: The information on this form is collected for purposes related to monitoring compliance under the Plumbing and Drainage Act 2002, the Building Act 1975 and the Building Fire Safety Regulation 2008 (“legislation”). This information may be stored in the department's database and may be used for statistical research, information provision and evaluation of Plumbing Industry Council and state government services. Your personal information may be disclosed to other government agencies, local government authorities and third parties for purposes related to this application Except for these circumstances, personal information will only be disclosed to third parties with your consent or in accordance with the Information Privacy Act 2009. RTI: The information collected on this form will be retained as required by the Public Records Act 2002 and other relevant Acts and regulations, and is subject to the Right to Information regime established by the Right to Information Act 2009. If you have any further questions regarding your privacy, please email Building Codes Queensland on [email protected] © The State of Queensiand.(Deparimentbof,bousing-and: Public: Works) sJilly-2014-Published:bysthe Queensiand-Governmenindtli-201444- George Street» BrisbaneQLD.4000
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewSearchable page text hides email addresses. Original files are unchanged and may show email addresses.