Skip to the record
NoosaWatch™: The source of truth.

Original source · versioned page text

Attachment 4 - Building Certifier Advice & Flow Pressure Test Results.pdf

of 5

Page text read automatically using OCR, there may be inaccuracies

Australian Fire Services Testing # 11647.3

www.firetesting.com.au PH: 1800 347 383

 

Hydrant pictured below is connected to the hydrant booster assembly. This hydrant needs to be
labelled an “Attack Fire Hydrant” so it cannot be confused attempted to be used as a feed

hydrant for the sprinkler booster.

 

Hydrant system Block Plan does not show two external Double Head Pillar Hydrants and new to
redrafted and replaced.

  
  
  
 
  
 
  
 
 
  
  

  

\
‘
NOTES
SYSTEM DESIGN:
20US @ 350kPa - UNASSISTED
Two Double Head Suse TONES “WHEN BOOSTED
ydrants that are ‘ sa
Lege Or lacHesr. HYDRANT ABOVE BOOSTE
not on Blogk Pla YEAR OF INSTALLATION: 2004

   

‘SYSTEM INSTALLED BY: TACOMA PLUMBING & G

LEGEND

DUAL PILLAR HYD 33
65mm HYDRANT VALVE 3

36m FHR @
ISOLATION VALVE 4
STREET HYDRANT oo
ELECTRICAL SWITCH BOARD Lal
BOOSTER CABINET (es)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Log in to download the original (Attachment 4 - Building Certifier Advice & Flow Pressure Test Results.pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.