Skip to the record
Search everything, all in one place.

Original source · versioned page text

2018-05-08 Planning & Environment Committee Agenda

of 125

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (14.7 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                       8 MAY 2018


    Submit certification.
    33.   Prior to the commencement of the use certification by a suitably qualified person that
          the pipework has been constructed and installed in accordance with the above
          requirements must be submitted to Council.
    Leak detection for underground tanks
    34.   Prior to the commencement of the use underground petroleum storage tanks shall be
          monitored for leaks in accordance with the following:
          a.   Establish a statistical inventory analysis system that is rated to detect a release
               of 0.76 litres/hour (or a release of 18 L/day), with greater than 95% confidence
               (and less than 5% false positive) or install automatic tank gauging that is rated
               to detect a release of 0.76 litres/hour (or a release of 18 L/day), with greater
               than 95% confidence (and less than 5% false positive).
          b.   Install a tank pit observation well at the lowest point of each tank excavation pit.
    Submit certification
    35.   Prior to the commencement of the use certification from a suitably qualified person
          that the leak detection system was installed and was verified as meeting the above
          leak detection performance standard using the current United States Environmental
          Protection Agency (USEPA) protocol must be submitted to Council.
    Leak detection for pipework
    36.   Prior to the commencement of the use product pipework shall be monitored for leaks
          in accordance with the following:
          a.   Install electronic line leak detection for pressure piping that is rated to detect a
               release of 0.76 litres/hour (or a release of 18 L/day), with greater than 95%
               confidence (and less than 5% false positive); or
          b.   Install ‘safe suction’ design for suction piping in compliance with cl 4.3.4 AS
               4897. The design, installation and operation of underground petroleum storage
               systems.
    Submit certification
    37.   Prior to the commencement of the use certification from a suitably qualified person
          that the leak detection system was installed and was verified as meeting the above
          leak detection performance standard using the current United States Environmental
          Protection Agency (USEPA) protocol must be submitted to Council, or
    38.   Prior to the commencement of the use certification from a suitably qualified person
          that the safe suction design has been installed and tested to comply with cl 4.3.4 AS
          4897. The design, installation and operation of underground petroleum storage
          systems must be submitted to Council.
    Fuel dispensing areas
    39.   Prior to the commencement of the use fuel dispensing areas shall be constructed and
          installed in accordance with the following:
          a.   All ground surfaces within the fuel dispensing area are to be constructed of
               impermeable materials such as waterproofed, reinforced concrete that is free of
               gaps and/or cracks. Impermeable, hydrocarbon resistant jointing material is to
               be used between treated concrete slabs.
          b.   The fuel dispensing area is to be clearly demarcated from the uncovered
               forecourt area, access roads, general parking bays and all other areas to
               clearly delineate the higher contamination risk area from lower risk areas.


                                                                                    Page 9 of 125
Log in to download the original file

2018-05-08 Planning & Environment Committee Agenda(PDF, 14MB).pdf · 14.7 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.