SDA-0117-036529 - s285 Concurrence agency response With conditions_combined
Attached to the e-mail Concurrence agency response with conditions - Claude Batten Dr.
SDA-0117-036529
No. Conditions Condition timing
2016.0028-011, revision A;
o Site 9, prepared by International Coastal
Management, dated 20 Oct 2016, reference
2016.0028-012, revision A;
o Site 10, prepared by International Coastal
Management, dated 20 Oct 2016, reference
2016.0028-013, revision A;
o Site 11, prepared by International Coastal
Management, dated 20 Oct 2016, reference
2016.0028-014, revision A;
o Site 12, prepared by International Coastal
Management, dated 20 Oct 2016, reference
2016.0028-015, revision A;
o Site 13, prepared by International Coastal
Management, dated 20 Oct 2016, reference
2016.0028-016, revision B;
o Site 14, prepared by International Coastal
Management, dated 20 Oct 2016, reference
2016.0028-017, revision A;
o Site 16, prepared by International Coastal
Management, dated 20 Oct 2016, reference
2016.0028-019, revision A;
o Detail, prepared by International Coastal
Management, dated 20 Oct 2016, reference
2016.0028-020, revision A;
12. Provide written notice to [email protected], when the At least five (5)
development authorised under this approval has started, and business days but
when it has been completed. no greater than
twenty (20)
These notices must state this permit number, the location and business days prior
the condition number under which the notice is being given. to the
commencement of
The notice advising of the completion date must also include a fisheries
report documenting the completed development works, including development works
but not limited to:
photographs taken before, during and after the And then, as to the
development works at specific photo-monitoring sites. notice advising of the
completion date,
within 15 business
an evaluation of the actual impacts of the development days of the
on the Noosa River Fish Habitat Area as per section 12 completion of the
Monitoring schedule, of the Noosa River Oyster Reef fisheries
Restoration Plan, prepared by Dr Ben Gilby, Dr Andrew development works.
Olds, Dr Thomas Schlacher, Dr Simon Walker and Dr
Michael Gloster, dated 11 January 2017.
13. Spoil is not disposed of on tidal lands or within waterways and is At all times
managed to prevent acid soil development.
Department of Infrastructure, Local Government and Planning Page 9
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.