19 Viewland Drive Final Renovation Plans Stage 16 · OPW19/0180
Attached to the e-mail Operational Works Application OPW19/0180 - DA Form 1 - Supporting information document - Plans - Plans - Arborist Report - at 19 Viewland Drive Noosa Heads.
Plans and drawings: the text below has words only, no drawings.
GENERAL NOTES 19 viewland drive, noosa heads 4567 lot 8 on RP88535 TIMBER FRAMING AND CONSTRUCTION 1. ALL CONSTRUCTION TO BE IN ACCORDANCE WITH THE AUSTRALIAN DOMESTIC BUILDING CODE. 2. ALL TIMBER FRAMING TO BE IN ACCORDANCE WITH AS 1684.2 2010 RESIDENTIAL TIMBER FRAMING MANUAL. 3. PINE FRAMING TO BE MINIUMUM STRESS GRADE MGP 10/MGP12 4.HARDWOOD FRAMING TO BE MINIMUM STRESS GRADE F14 & MINIMUM JOINT GROUP J2. 5. TIMBER FOR TRUSSES TO BE MINIMUM JOINT GROUP JD4. 6. TRUSSES TO BE FIXED IN ACCORDANCE WITH MANUF. SPECIFICATIONS ALL OTHER FIXINGS TO BE IN ACCORDANCE WITH AS 1684.2 2010 7.LAMINATED BEAM SIZES BASED ON HYNEBEAM SPAN TABLES WHERE OTHER BRANDS ARE USED, SIZES TO BE CONFIRMED WITH MANUFACTURERS SPECIFICATIONS. 8. ALL DIMENSIONS TAKE PRECEDENCE OVER SCALES 9. BUILDER AND TRADES ARE TO CONFIRM ALL MEASUREMENTS, DETAILSAND SPECIFICATIONS PRIOR TO SETOUT AND ORDERING OF MATERIALS 10. ANY ERRORS ARE TO BE ADDRESSED TO THE DESIGNER AS NO RESPONSIBILITY WILL BE TAKEN AFTER CONSTRUCTION HAS COMMENCED 11. ALL TRADES ARE TO CONFORM WITH THE CURRENT AUSTRALIAN STANDARDS RELATING TO HIS OR HER OWN WORK 12. TERMITE PROTECTION TO BE PROVIDED AS PER AS 3660.1.2000 DOMESTIC SMOKE ALARMS 1. ALL BEDROOMS AND HALLWAYS ARE TO BE INSTALLED LEGEND TOTALS WITH PHOTO ELECTRIC SMOKE ALARMS IN ACCORDANCE WITH BUILDING FIRE SAFETY LEGISLATION AMENDMENT 1 SINGLE GPO REGULATION 2016 W 2. SMOKE ALARMS MUST BE POSITIONED IN ACCORDANCE 1W SINGLE WEATHER PROOF GPO WITH AS 1670.6 - 1997 FIRE DETECTION, WARNING, CONTROL 2 2 AND INTERCOM SYSTEMS. DOUBLE GPO 3. DEVICES MUST BE EITHER INTERCONNECTED OR HARD 2 DOUBLE WEATHER PROOFGPO WIRED (EXISTING DWELLINGS ONLY) THAT CANNOT BE 2W REMOVED FROM DEVICE 1200 LED BLADE LIGHTS 4. ALARMS TO BE INSTALLED IN ALL HALLWAYS AND BEDROOMS TO EXISTING RESIDENCES LED DOWNLIGHT S INDICATES THE LOCATION OF WIRED SMOKE ALARMS SWITCH TWO WAY SWITCH GLAZING 1. DOOR AND WINDOW SCHEDULE IS INDICATIVE ONLY AND TV SUBJECT TO CONFIRMATION UPON SITE MEASURE FOXTEL 2. OBSCURE WINDOW NOTATION REFERENCE ONLY, CLIENT PHONE TO CONFIRM WITH BUILDER AND WINDOW SUPPLIER FOR ground floor electrical plan PRIVACY OPTIONS DATA UP SMOKE DETECTORS ELECTRICAL AND ENERGY EFFICIENCY CHANDELIERS 1. ELECTRICALS TO BE CONFIRMED BY OWNER/BUILDER AND ELECTRICIAN, PROPOSED PLAN IF REQUESTED PENDANT LIGHTS INDICATIVE ONLY TWIN FLOOD LIGHTS DOWNPIPES CENSOR ALL LOCATED DOWNPIPES INDICATIVE ONLY AND CONFIRMED AT TIME OF ROOFING CONSTRUCTION EXTERNAL WALL LIGHTS AND COMPLIANCE CEILING FANS ELECTRICAL TEMPLATE FOR USE BY OWNER/BUILDER EXHAUST FAN LIGHT FAN LIGHT HEATER NOTE: INSTALLATION OF ALL EXTERNAL MATERIALS BY BUILDER AS PER MANUFACTURERS SPECIFICATIONS AND CERTIFICATION REQUIREMENTS AS OUTLINED BY NCC PROPOSED: CLIENT: RON O'GRADY BUILDER: MANDY'S DESIGN & DRAFTING SHEET: 13 of 16 DATE: ISSUE NO: RENOVATION EXTENSION PH: 0417 602 074 TBC PH: 0403 481 474 SCALE: 1:100 14 AUG 2019 P -FINAL NOTE: THESE DRAWINGS TO BE READ IN CONJUNCTION NOTE: BUILDER TO CONFIRM SITING AND DIMENSIONS BEFORE CONSTRUCTION WITH ENGINEERS DRAWINGS RESPONSIBILITY LIES THERE WITH
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
19 Viewland Drive Final Renovation Plans Stage 16.pdfRelated documentApplication case desk ↗
Final Renovation Plans Stage 16.pdfRelated documentApplication case desk ↗
About this file
- File size
- 1.2 MB (small file)
- File type
No other editions are linked here.