19 Viewland Drive Final Renovation Plans Stage 16 · OPW19/0180
Attached to the e-mail Operational Works Application OPW19/0180 - DA Form 1 - Supporting information document - Plans - Plans - Arborist Report - at 19 Viewland Drive Noosa Heads.
Plans and drawings: the text below has words only, no drawings.
GENERAL NOTES 19 viewland drive, noosa heads 4567 lot 8 on RP88535 TIMBER FRAMING AND CONSTRUCTION 90 70 70 70 90 70 70 90 1. ALL CONSTRUCTION TO BE IN ACCORDANCE WITH 70 2575 940 530 70 2725 2725 1000 2635 bath 4275 THE AUSTRALIAN DOMESTIC BUILDING CODE. 70 70 70 2. ALL TIMBER FRAMING TO BE IN ACCORDANCE WITH 1815 840 840 1815 70 AS 1684.2 2010 RESIDENTIAL TIMBER FRAMING MANUAL. 3. PINE FRAMING TO BE MINIUMUM STRESS GRADE 70 4205 70 600 70 MGP 10/MGP12 confirm cabinetry 10 of 16 4.HARDWOOD FRAMING TO BE MINIMUM STRESS 70 70 70 70 70 70 1000 3505 1645 1645 1370 650 920 1000 1345 4575 90 GRADE F14 & MINIMUM JOINT GROUP J2. 5. TIMBER FOR TRUSSES TO BE MINIMUM JOINT GROUP JD4. Elevation 3 - east vanity 6. TRUSSES TO BE FIXED IN ACCORDANCE WITH MANUF. Elevation 2 - south 1600 SPECIFICATIONS ALL OTHER FIXINGS TO BE IN recessed 3 5 ACCORDANCE WITH AS 1684.2 2010 cabinets 09 of 16 recessed cabinets + mirrors 7.LAMINATED BEAM SIZES BASED ON HYNEBEAM SPAN with mirrors TABLES WHERE OTHER BRANDS ARE USED, SIZES TO dp dp 600 dp BE CONFIRMED WITH MANUFACTURERS SPECIFICATIONS. 04512LW obs 2406LW 1512LW 1512LW 0906LW obs 1509LW obs 1512LW 70 70 8. ALL DIMENSIONS TAKE PRECEDENCE OVER SCALES 70 9. BUILDER AND TRADES ARE TO CONFIRM ALL twls 800 400 wall freestanding 2/820q/slide hung MEASUREMENTS, DETAILSAND SPECIFICATIONS PRIOR TO niche solar tube 1795 SETOUT AND ORDERING OF MATERIALS robe vanity 900 10. ANY ERRORS ARE TO BE ADDRESSED TO THE DESIGNER walk in shower hood bath fw 2775 3/1506LW 3005 bed 2 bed 3 solar bed 4 720csd 1800 AS NO RESPONSIBILITY WILL BE TAKEN AFTER ens 820 1700 tube 70 (carpet) (carpet) (carpet) CONSTRUCTION HAS COMMENCED 2/520 3/520 glass 11. ALL TRADES ARE TO CONFORM WITH THE bath niche 4 4 770csd 900 CURRENT AUSTRALIAN STANDARDS RELATING TO HIS OR 70 475 l'dry chute 1500 4/720q/slide 530 70 70 niche HER OWN WORK 70 6595 720 720 820 robe robe store robe 12. TERMITE PROTECTION TO BE PROVIDED AS PER AS 3660.1.2000 70 3/820 3990 600 4/1506LW 1000 store 820 3010 (vinyl plank) master solar tube DOMESTIC SMOKE ALARMS 3610 dine 1. ALL BEDROOMS AND HALLWAYS ARE TO BE INSTALLED 90 2/3 br. bench 1000 WITH PHOTO ELECTRIC SMOKE ALARMS IN ACCORDANCE ohc 820 (carpet) pantry 2 2 50 study 1500 520 refs (vinyl plank) WITH BUILDING FIRE SAFETY LEGISLATION AMENDMENT 620 7/1506LW (carpet) 4/820q/slide REGULATION 2016 desk 2400x820 brace 70 900 2. SMOKE ALARMS MUST BE POSITIONED IN ACCORDANCE hood 70 530 70 robe shvs 1512LW 4200 solar tube WITH AS 1670.6 - 1997 FIRE DETECTION, WARNING, CONTROL 650 wo 7300 dp 2406LW AND INTERCOM SYSTEMS. 4160 70 1506LW 1506LW landing DN 1200 3. DEVICES MUST BE EITHER INTERCONNECTED OR HARD 1000 cabinetry to be confirmed WIRED (EXISTING DWELLINGS ONLY) THAT CANNOT BE 1212LW kit by owner/cabinetmaker REMOVED FROM DEVICE 4. ALARMS TO BE INSTALLED IN ALL HALLWAYS AND (vinyl plank) 1100 BEDROOMS TO EXISTING RESIDENCES S INDICATES THE LOCATION OF WIRED SMOKE ALARMS 2590 600 600 line GLAZING o carp f 300 et fin DN 900h wall 1. DOOR AND WINDOW SCHEDULE IS INDICATIVE ONLY AND ish 90x90 timber posts SUBJECT TO CONFIRMATION UPON SITE MEASURE 2. OBSCURE WINDOW NOTATION REFERENCE ONLY, CLIENT 900h wall + timber 750 2427OXXSD TO CONFIRM WITH BUILDER AND WINDOW SUPPLIER FOR 1521FG 1 deck 1 handrail to be lounge PRIVACY OPTIONS 3800 hood confirmed by owner 1000 (tiles) timber (carpet) treads ELECTRICAL AND ENERGY EFFICIENCY 3795 timber post 1. ELECTRICALS TO BE CONFIRMED BY OWNER/BUILDER 1521FG 90 AND ELECTRICIAN, PROPOSED PLAN IF REQUESTED 90x90 INDICATIVE ONLY Elevation 4 -north balcony downpipe to run 2400x820 1910 through deck 200 proposed upper floor 10 of 16 (tiles) DOWNPIPES 600 specific horizontal powder coated ALL LOCATED DOWNPIPES INDICATIVE ONLY AND Elevation 1 - west dp screening/balustrading as selected by owner CONFIRMED AT TIME OF ROOFING CONSTRUCTION AND COMPLIANCE 3 WINDOW SCHEDULE 09 of 16 5 1x1524LW 4 PANEL 4x1512LW 2 PANEL 70 75 3480 4575 90 1x1518LW 3 PANEL 1x1542 LW 7 PANEL 75 600 2250 1000 4275 90 2x1506 LW 90 2x2406LW bench 5510 2690 1x04512 LW obs 2 PANEL 1x1212 LW 2 PANEL 6375 3500 deck 5600 2600 90 1x0906LW obs 1X1509LW obs 2x1521FG NOTE: INSTALLATION OF ALL EXTERNAL MATERIALS BY BUILDER AS PER MANUFACTURERS SPECIFICATIONS AND CERTIFICATION REQUIREMENTS AS OUTLINED BY NCC PROPOSED: CLIENT: RON O'GRADY BUILDER: MANDY'S DESIGN & DRAFTING SHEET: 8 of 16 DATE: ISSUE NO: RENOVATION EXTENSION PH: 0417 602 074 TBC PH: 0403 481 474 SCALE: 1:100 14 AUG 2019 P -FINAL NOTE: THESE DRAWINGS TO BE READ IN CONJUNCTION NOTE: BUILDER TO CONFIRM SITING AND DIMENSIONS BEFORE CONSTRUCTION WITH ENGINEERS DRAWINGS RESPONSIBILITY LIES THERE WITH
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
19 Viewland Drive Final Renovation Plans Stage 16.pdfRelated documentApplication case desk ↗
Final Renovation Plans Stage 16.pdfRelated documentApplication case desk ↗
About this file
- File size
- 1.2 MB (small file)
- File type
No other editions are linked here.