Stormwater Drainage
35. The site must be provided with a stormwater drainage system connecting to a
lawful point of discharge.
36. All stormwater runoff from the site must be discharged in to Council’s kerb and
channel drainage system in Nannygai Street.
37. Approved kerb adapters must be constructed at each outlet point.
38. Electricity and Telecommunication Services
39. Unless otherwise stipulated by telecommunications legislation at the time of
construction, the development must be provided with all necessary conduits,
pits and pipes to accommodate the future connection of optic fibre technology
telecommunications.
40. Certification must be submitted to Council from all relevant service providers
which certifies that the development has met the requirements of this Decision
Notice and all applicable legislation at the time of construction.
Earthworks and Retaining Walls
41. All fill and associated batters must be contained entirely within the subject site
unless written permission from the respective landowner(s) is provided to
Council. All earthworks must be undertaken in accordance with the provisions
of Australian Standard AS3798: Guidelines on Earthworks for Commercial and
Residential Developments.
42. Where the development involves excavation or filling over, or adjacent to,
drainage, water supply or sewerage infrastructure, all access chamber surface
levels must be adjusted to provide a freeboard of 100mm above the finished
ground surface level.
Damage to Services and Assets
43. Any damage caused to existing services and assets as a result of the
development works must be repaired at no cost to the asset owner at the
following times:
a. where the damage would cause a hazard to pedestrian or vehicle safety,
immediately; or
b. where otherwise, upon completion of the works associated with the
development.
Development Permit for Operational Works (Vehicle Crossover, Landscaping,
Drainage Works and Carparking)
OPERATIONAL WORKS
Approved Plans
1. Development undertaken in accordance with this approval must generally
comply with the approved plans of development. The approved plans are listed
in the following table unless otherwise amended by these conditions.
Plan No. Rev. Plan/Document Name Date
1193-SK01 Driveway Layout, prepared by Contour 1 July 2014
1193-SK03 Stormwater Management Plan, prepared by 7 July 2014
Contour
4416SM PB Stormwater Plan, prepared by I Want That Design 17 July 2014
1193-SK04 A Live Sewer Works Table 2 Sept 2014
CD-001 A Cover Sheet Notes and Schedules, prepared by 3 July 2014
DFS Group
CD-002 A External Works and Planting Plan, prepared by 3 July 2014
DFS Group
CD-003 A Landscape Details, prepared by DFS Group 3 July 2014
Page 11 of 27
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.